
Bitumen bathroom waterproofing in Al Basatin (near Abqaiq)
Bitumen bathroom waterproofing in Al Basatin begins with a photo of the floor and walls to be protected, sent by call or WhatsApp. Al Basatin has residential buildings and villas, and their bathrooms need strong bitumen protection before final tiling.
Al Basatin is a mix of residential buildings and villas, some older and some fairly new. Bathrooms in these buildings vary in size and age, and older ones may show damp stains. Bitumen is applied to the floor and lower walls before screed and tiles to protect the building from water seepage. The existing surface condition determines the application method, as an older bathroom may need extra treatment before bitumen is applied. Photos help us assess the current situation and identify the steps needed.
- Al Basatin is a district in the Eastern Province, near Ghirnatah, Ishbiliyah and Ar Rabwah.
- A home or apartment bathroom faces constant water and steam, and bitumen beneath tiles forms a barrier protecting concrete from seepage and dampness.
The main items of bitumen bathroom waterproofing in Al Basatin (near Abqaiq)
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Turning the layer up the walls in the wet zone and sealing the corners
- Checking the concrete floor and wall bases and identifying cracks
This is how we work in Al Basatin (near Abqaiq)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from Al Basatin (near Abqaiq) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Basatin (near Abqaiq) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen bathroom waterproofing in Al Basatin (near Abqaiq)
Must old tiles be removed before applying bitumen in Al Basatin?
Yes, if there are old tiles or previous materials, the floor and walls must be cleaned thoroughly before bitumen is applied. Photos show whether old materials need removal, and we work through the preparatory steps with you.
Can a bathroom in an old villa in Al Basatin be waterproofed without removing the current tiles?
Usually not, because bitumen must be directly under the tiles on a clean surface. If you want to renovate the bathroom, removal is necessary, then we apply bitumen and new tiles. Photos show the condition of the current tiles and help us explain the steps clearly.
How do I request bitumen bathroom waterproofing in Al Basatin (near Abqaiq)?
Call us, or send clear photos of the spot and its location in Al Basatin (near Abqaiq) on WhatsApp, and we will work out the next step with you.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Areas near Al Basatin (near Abqaiq)
We also work near Al Basatin (near Abqaiq), in Ghirnatah (near Abqaiq), Ishbiliyah (near Abqaiq) and Ar Rabwah (near Abqaiq).
More services in Al Basatin (near Abqaiq)




