
Bitumen bathroom waterproofing in Ghirnatah (near Abqaiq)
Bitumen bathroom waterproofing in Ghirnatah begins with photos sent by call or WhatsApp. The district has diverse residential buildings, where bathrooms need protection before screed is poured and tiles are laid.
Bathrooms in Ghirnatah face daily humidity and regular water flow, and bitumen provides effective defence before finishing. Villas and buildings in the district may differ in concrete age and condition; older structures may need cleaning and crack repair, while newer ones benefit from precise, tight waterproofing. Photos show the base surface, joints, corners and openings to determine the right method.
- Ghirnatah is a district in the Eastern Province, near Al Basatin, Qurtubah and Al Nakhil, with diverse residential buildings.
- Bitumen applied before screed and tiles protects concrete from water absorption and long-term damage.
The main items of bitumen bathroom waterproofing in Ghirnatah (near Abqaiq)
- Checking the concrete floor and wall bases and identifying cracks
- Applying bitumen layers over the floor including the shower area
- Confirming full drying before the screed is poured
- Cleaning the surface and treating cracks and corners before application
The steps of bitumen bathroom waterproofing in Ghirnatah (near Abqaiq)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Ghirnatah (near Abqaiq) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Ghirnatah (near Abqaiq) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Ghirnatah (near Abqaiq)
Should bathroom bitumen waterproofing be done before or after screed is poured?
Right before screed. After concrete and cracks are repaired, bitumen goes on the clean surface, then screed is poured over it. Send photos after concrete is done.
How do you handle waterproofing around pipes and drains in a bathroom in Ghirnatah?
We apply bitumen carefully around all openings and joints to prevent leakage. Photos will show us where pipes and drains are so we can focus protection on them securely.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Is Ghirnatah (near Abqaiq) within your service area?
Yes, Ghirnatah (near Abqaiq) is one of the areas we work in, as are Al Basatin (near Abqaiq), Qurtubah (near Abqaiq) and Al Nakhil (near Abqaiq). To start, call us or message us on WhatsApp.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Areas near Ghirnatah (near Abqaiq)
We also work near Ghirnatah (near Abqaiq), in Al Basatin (near Abqaiq), Qurtubah (near Abqaiq) and Al Nakhil (near Abqaiq).
More services in Ghirnatah (near Abqaiq)




