Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Basatin (near Abqaiq)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Basatin (near Abqaiq)

Bathroom waterproofing before tiling in Al Basatin begins with photos of the bathroom and any seepage or dampness, sent by WhatsApp or call. Al Basatin is a mixed residential area, and a waterproof membrane beneath tiles protects against moisture seeping to lower floors and neighbouring walls.

Al Basatin comprises detached houses, villas and small apartment blocks with varied designs and ages. An older house bathroom may suffer cracked flooring or recurring dampness, while a newly built one needs waterproofing before tiling begins. Daily moisture always penetrates tiles and grout without protection, gradually weakening structures. Send clear photos of wet floors and walls and any known leaks to determine the membrane extent and type.

  • Al Basatin is a district in the Eastern Province near Ghirnatah, Ishbiliyah and Ar Rabwah, with residential buildings of varying ages.
  • Concrete floors in older bathrooms may show hairline cracks from repeated drying and wetting over years.
What the service includes

The main items of bathroom waterproofing before tiling in Al Basatin (near Abqaiq)

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

This is how we work in Al Basatin (near Abqaiq)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Basatin (near Abqaiq) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Basatin (near Abqaiq) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Al Basatin (near Abqaiq)

When should a bathroom in Al Basatin be waterproofed: before or after tiling?

Waterproofing must be done just before tiling. Waterproofing after tiles are laid does not protect against leaks behind existing tiles. If you have an old bathroom with old tiles, they must be removed first, then the membrane and new tiles applied.

How long does it take to waterproof a bathroom in Al Basatin?

Duration depends on the bathroom size, surface condition, and whether old tiles need removing. Send photos and describe the situation clearly so we can assess requirements with you.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What should I send you from Al Basatin (near Abqaiq)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Basatin (near Abqaiq), and we will work out the next step with you.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

The same service in nearby areas

If the site is outside Al Basatin (near Abqaiq), the same service is available in Ghirnatah (near Abqaiq), Ishbiliyah (near Abqaiq) and Ar Rabwah (near Abqaiq).

Other services in the area

More services in Al Basatin (near Abqaiq)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Basatin (near Abqaiq):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp