Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Athir

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Athir

Bitumen bathroom waterproofing in Al Athir starts with photos by WhatsApp or direct call. The district has homes and villas of varying ages, with many bathrooms needing leak and damp repair.

Old bathrooms in Al Athir are prone to cracking and leaks at joints and corners, while newer ones may need lining renewal if worn. Bitumen is sprayed or brushed on the floor and wall base before screed and tiles, and old moisture and salts must be removed first. The district is generally dry but wet bathrooms create an environment that can speed lining decay. Photos show crack and damp condition to choose the right method.

  • Al Athir is a residential district in the Eastern Province, near Ad Dabab, Al Jalawiyah and Al Qadisiyah, with homes and villas of various kinds.
  • A bathroom leak in an older building may occur at several points: the floor, corners, and joints between walls and floor.
What the service includes

The bitumen bathroom waterproofing work in Al Athir

  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
How we work

From first contact to the finished job in Al Athir

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Al Athir comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Athir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Athir

Do you waterproof old villa bathrooms in Al Athir?

Yes. Send bathroom photos and tell us about the leak and damp, and we will judge from the photos whether bitumen waterproofing suits it or needs extra steps.

Does bitumen block salt and moisture from below the floor?

Bitumen creates a barrier on the surface, but if moisture comes from below the foundation, extra treatment may be needed. Photos clarify the problem's source to determine the right solution.

How do I request bitumen bathroom waterproofing in Al Athir?

Call us, or send clear photos of the spot and its location in Al Athir on WhatsApp, and we will work out the next step with you.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

The same service in nearby areas

We also work near Al Athir, in Ad Dabab (near Al Athir), Al Jalawiyah and Al Qadisiyah.

Other services in the area

More services in Al Athir

Pool at night with water jets after waterproofing

In Al Athir and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Athir, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp