Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Athir

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Athir

Bathroom waterproofing before tiling in Al Athir begins with photos sent by call or WhatsApp. The district has villas and small apartment blocks, each bathroom needing a continuous waterproof membrane to protect the structure from daily moisture. We assess the floor and walls from the photos before choosing the method.

Bathrooms in the district range in size, as do the villas and apartment blocks. Concrete floors need careful cleaning and preparation before the membrane. Walls around showers and tubs face constant water pressure, and the joints between floor and walls are most prone to leaks. The waterproof membrane covers all these areas before tiling.

  • Al Athir is a district in the Eastern Province, close to Ad Dabab, Al Jalawiyah and Al Qadisiyah, with villas and residential apartment blocks.
  • A modern bathroom has a shower or tub or both, each with its own moisture zone that the membrane must cover.
What the service includes

The bathroom waterproofing before tiling work in Al Athir

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The stages of the work in Al Athir

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Al Athir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Athir comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Athir

What is determined from a bathroom photo before waterproofing?

We see the concrete condition, cracks and joints, the bathroom size and shape, and where the shower, tub and pipes are. This helps us calculate the membrane needed and plan application.

Does applying the waterproof membrane delay tiling much?

The membrane needs drying time depending on its type and conditions. The delay is part of the proper process, not extra waiting but a necessary step before tiling.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you cover Al Athir?

Yes. We serve Al Athir and nearby areas such as Ad Dabab (near Al Athir), Al Jalawiyah and Al Qadisiyah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Athir, in Ad Dabab (near Al Athir), Al Jalawiyah and Al Qadisiyah.

Other services in the area

More services in Al Athir

Worker applying the white insulation layer on a villa roof by the sea

In Al Athir and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp