Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Qadisiyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Qadisiyah

Bathroom waterproofing before tiling in Al Qadisiyah starts with photos by call or WhatsApp. The district has villas and residential buildings of various ages, with bathrooms that vary in condition and design.

Al Qadisiyah has older villas and relatively newer apartment buildings, each with different pre-tiling needs. Older villas may need full tile and mortar removal followed by thorough treatment before a new waterproofing layer. Newer buildings may only need the first waterproofing application. Indoor humidity and daily bathroom use stress any weakness in waterproofing. Photos show the current floor and wall state and whether there is old seepage or concrete damage.

  • Al Qadisiyah is a residential district in the Eastern Province, close to Ghirnatah, Ad Dabab and Ettisalat, with villas and apartment buildings.
  • A bathroom serving a whole family daily needs robust waterproofing that tolerates steam, hot water and cold water alike.
What the service includes

The main items of bathroom waterproofing before tiling in Al Qadisiyah

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

This is how we work in Al Qadisiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Al Qadisiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Qadisiyah and around itIncluding Ghirnatah (near Dammam), Ad Dabab (near Al Athir) and Ettisalat, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Qadisiyah

Do we need to remove old tiles in Al Qadisiyah before waterproofing starts?

Yes, old tiles and mortar must be removed completely so we reach the concrete surface. Then we clean it, dry it and apply the new membrane. Photos will show us if the surface beneath is sound or needs extra treatment.

How long does bathroom waterproofing take in Al Qadisiyah before tiling?

That depends on the bathroom's current condition and size. A small bathroom may be quicker than a large one. Photos and a call will tell you the steps and time needed before we start work.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Do you cover Al Qadisiyah?

Yes. We serve Al Qadisiyah and nearby areas such as Ghirnatah (near Dammam), Ad Dabab (near Al Athir) and Ettisalat, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ghirnatah (near Dammam), Ad Dabab (near Al Athir) and Ettisalat.

Other services in the area

More services in Al Qadisiyah

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Qadisiyah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp