Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ettisalat

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ettisalat

In Ettisalat we begin bathroom waterproofing before tiling with photos of the floor and the walls around the shower, sent by call or WhatsApp. They show the membrane each bathroom needs before adhesive and tiles go down.

Ettisalat in Dammam has scattered villas and apartment blocks, and its bathrooms range from new to older. In older ones damp usually shows behind the tiles at the corner where floor meets wall, so the work focuses there. Newer bathrooms generally only need the spray and shower zone covered. The photos tell us which case applies to yours.

  • Ettisalat is a residential district in Dammam, Eastern Province, lying near Ar Rayyan, Ghirnatah and Ibn Khaldun.
  • The wall around the shower takes more water than any other part, so it needs a continuous layer that does not break at the corners.
What the service includes

The main items of bathroom waterproofing before tiling in Ettisalat

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

From first contact to the finished job in Ettisalat

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Ettisalat is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Ettisalat and around itIncluding Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Ettisalat

Is the whole bathroom waterproofed or just the shower area in Ettisalat?

That depends on the damp and floor condition the photos show. If the rest of the floor is sound we may cover only the shower zone, otherwise we recommend wider coverage.

Do you serve bathrooms in villas in Ettisalat?

Yes, we serve Ettisalat. Send the photos via WhatsApp, and say whether the bathroom is on the ground or upper floor so we can arrange the work with you.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Is Ettisalat within your service area?

Yes, Ettisalat is one of the areas we work in, as are Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun. To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

The same service in nearby areas

We also work near Ettisalat, in Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun.

Other services in the area

More services in Ettisalat

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ettisalat
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp