Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ettisalat

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ettisalat

Bitumen bathroom waterproofing in Ettisalat begins with photos of the floor and wall bases sent by call or WhatsApp. The district lies near Ar Rayyan, Ghirnatah and Ibn Khaldun, and the bitumen treats the floor before tiling.

Ettisalat contains mid-sized flats and villas, with bathrooms ranging from newly fitted to well-used. In flats the bathroom is often small and many pipes run beneath the floor, which makes the wall bases the key point of waterproofing. The photos show where the pipes and junctions lie before any layer goes on.

  • Ettisalat is a residential district in Dammam in the Eastern Province, lying near Ar Rayyan, Ghirnatah and Ibn Khaldun.
  • Pipes run beneath small bathroom floors, and problems usually gather where they exit the wall.
What the service includes

What we do for you in Ettisalat

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
How we work

The stages of the work in Ettisalat

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Ettisalat and around itIncluding Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun, as part of our work across the Eastern Province.

Ettisalat is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Ettisalat

Can a flat bathroom in Ettisalat be waterproofed without demolition?

In many cases yes, if the floor is sound and the walls are accessible. The photos will show whether partial demolition is needed.

Do you treat pipe junctions in Ettisalat bathrooms?

Yes, wall bases and pipe exit points are treated as part of the waterproofing. Send clear photos so we can identify the positions before starting.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I request bitumen bathroom waterproofing in Ettisalat?

Call us, or send clear photos of the spot and its location in Ettisalat on WhatsApp, and we will work out the next step with you.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

Areas near Ettisalat

We also work near Ettisalat, in Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun.

Other services in the area

More services in Ettisalat

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Ettisalat?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp