Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Jalawiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Jalawiyah

Bitumen bathroom waterproofing in Al Jalawiyah begins with a WhatsApp message containing photos of the floor and wall bases. The district has separate houses and villas where bathrooms need strong protection against moisture seepage.

Al Jalawiyah has separate houses and villas, each with multiple bathrooms that may differ in age and use. Bitumen is applied to all surfaces exposed to water before screed and tiles. Older floors may need extra cleaning and preparation, and new floors need protection from the start. Moisture in the area makes this waterproofing necessary for the building's long-term health.

  • Al Jalawiyah is a district in the Eastern Province, near Al Anud, Ghirnatah and Al Athir, with separate houses and villas.
  • A bathroom in a separate house may have several surfaces at different heights and locations, each needing a different method of bitumen application.
What the service includes

The main items of bitumen bathroom waterproofing in Al Jalawiyah

  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

How we carry out bitumen bathroom waterproofing in Al Jalawiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Al Jalawiyah and around itIncluding Al Anud, Ghirnatah (near Dammam) and Al Athir, as part of our work across the Eastern Province.

Your request from Al Jalawiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Jalawiyah

Does a new bathroom in Al Jalawiyah need bitumen waterproofing?

Yes, even new bathrooms need bitumen protection before tiling. Water will seep if this protection is not put in place from the start. Send photos of the floor and walls before finishing begins.

How long must you wait after bitumen application before tiling?

Drying depends on conditions, surface type and climate. Photos and consultation determine the time needed before the next step based on your situation.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What should I send you from Al Jalawiyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jalawiyah, and we will work out the next step with you.

Nearby areas

Areas near Al Jalawiyah

We also offer bitumen bathroom waterproofing in Al Anud, Ghirnatah (near Dammam) and Al Athir, among the closest areas to Al Jalawiyah.

Other services in the area

More services in Al Jalawiyah

Pool at night with water jets after waterproofing

In Al Jalawiyah and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Jalawiyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp