
Bitumen bathroom waterproofing in Second Industrial Area
Ab Raj Al Azl provides bitumen bathroom waterproofing in the Second Industrial Area, starting with photos of the bathroom sent by call or WhatsApp. The material is applied before screed and tiling to protect what lies beneath from water.
The Second Industrial Area is made up mainly of commercial buildings, offices and warehouses, and some units have shared washroom facilities. Bathroom floors in these buildings see heavy use, so dampness often shows at joints and drain entries. The photos determine the condition of each bathroom before a method is chosen.
- The Second Industrial Area lies in Al-Ahsa in the Eastern Province, next to the First and Third Industrial Areas.
- Shared washrooms see heavy use, which makes their joints more prone to wear.
What we do for you in Second Industrial Area
- Checking the concrete floor and wall bases and identifying cracks
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
- Confirming full drying before the screed is poured
How we carry out bitumen bathroom waterproofing in Second Industrial Area
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
We serve Second Industrial Area and around itIncluding First Industrial Area, Third Industrial Area and Industrial Area, as part of our work across the Eastern Province.
Bitumen bathroom waterproofing in Second Industrial AreaWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Second Industrial Area
Is bitumen suitable for commercial bathrooms here?
It may be, depending on the floor condition and how the bathroom is used. Send the photos and we will confirm whether bitumen suits that case.
Can the work be done without fully shutting shared facilities?
That depends on the layout and the number of users. We discuss the arrangement with you after reviewing the photos to see how much closure is needed during the work.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Do you offer bitumen bathroom waterproofing in Second Industrial Area?
Yes. Second Industrial Area is within our service area in the Eastern Province, and we also work in First Industrial Area, Third Industrial Area and Industrial Area. Call us or send photos of the spot on WhatsApp.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Bitumen bathroom waterproofing near Second Industrial Area
If the site is outside Second Industrial Area, the same service is available in First Industrial Area, Third Industrial Area and Industrial Area.
More services in Second Industrial Area




