Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in First Industrial Area

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in First Industrial Area

Bitumen bathroom waterproofing in the First Industrial Area begins with WhatsApp messages containing photos of the floor and base. The area has industrial buildings and small residential structures where bathrooms need robust waterproofing because dampness and leaks can affect productivity and comfort.

The First Industrial Area combines production buildings, small workshops, worker housing and small villas, all requiring bitumen waterproofing for bathrooms before screed and tiling. A bathroom in an industrial building or residential annex faces moisture from soil and heavy use, so weak waterproofing can cause leaks into walls and foundations. Bitumen forms a tight barrier before screed and tiles, ensuring long-term protection from leaks and dampness. Photos help us assess the foundation's condition and choose the right waterproofing method for each case.

  • The First Industrial Area is a district in the Eastern Province, near Al Lualu, Al Huwaylat and Ash Shati, with industrial and residential buildings.
  • A worker bathroom in an industrial building endures heavy use and constant moisture exposure, so bitumen waterproofing protects the structure from early deterioration.
What the service includes

The scope of the work in First Industrial Area

  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The steps of bitumen bathroom waterproofing in First Industrial Area

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from First Industrial Area with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from First Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in First Industrial Area

Does a workshop bathroom waterproofing differ from a small villa bathroom in the Industrial Area?

Both need bitumen before screed and tiling, but a workshop bathroom may need extra foundation protection if moisture is higher. Photos show the difference between the two cases.

How do we handle high moisture in First Industrial Area bathrooms?

Bitumen forms a barrier against moisture from below, and good ventilation plus tight tiling reduce dampness from use. Send photos to assess whether the bathroom needs extra waterproofing or better ventilation.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you cover First Industrial Area?

Yes. We serve First Industrial Area and nearby areas such as Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan), among the closest areas to First Industrial Area.

Other services in the area

More services in First Industrial Area

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in First Industrial Area?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp