
Kitchen waterproofing in First Industrial Area
Kitchen waterproofing in the First Industrial Area begins with photos of the floor, base walls and outlets sent by call or WhatsApp. The district has industrial buildings and workshops, where work kitchens often face exposure to damp and leaks.
The First Industrial Area has large production and storage buildings, each with kitchens for workers and staff. These kitchens endure heavy use and high humidity from repeated washing and exposed pipes. Concrete floors may show cracks and wear, and base walls can stay damp for long periods. Photos show the building condition and materials present, so a waterproofing solution fit for heavy use can be chosen.
- The First Industrial Area is a district in the Eastern Province, close to Al Lualu and Al Huwaylat, with large industrial buildings.
- Industrial kitchens see daily heavy use and repeated leaks from pipes and equipment, so waterproofing must be carefully planned.
The kitchen waterproofing work in First Industrial Area
- Cleaning the surface and treating cracks and joints
- Checking the floor, corners, drain opening and dishwasher outlet
- Applying a continuous waterproof layer that turns up at the wall bases
- Wrapping pipe openings and the dishwasher outlet in the waterproof layer
The stages of the work in First Industrial Area
Send photos of the kitchen
On WhatsApp: photos of the floor, the drain, the wall-to-floor corner, the dishwasher outlet and any damp stains, so we can read the stage and decide the right treatment.
Prepare the surface
The surface is cleaned of dust and old render residue, cracks and joints are treated, and the corners between the floor and the walls are sealed before any layer goes on.
Apply the waterproof layer
The layer covers the floor and turns up at the wall bases, closes around the drain, the dishwasher outlet and the pipe openings, depending on the surface type and the material that suits it.
Dry, then screed and tile
The layer is left to dry and cure, then the screed or levelling coat goes over it, and finally the tiles, so the waterproofing stays protected from wear and load.
Why Abraj Al Azl?
Water stays out of the concreteA continuous layer stops the slab absorbing water, protecting the reinforcement from rust and reducing later cracking.
Kitchen waterproofing in First Industrial AreaWe choose the method and the materials once we know the condition of the spot.
We serve First Industrial Area and around itIncluding Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book kitchen waterproofing in First Industrial Area
Can an industrial kitchen floor be waterproofed without closing the kitchen?
It depends on the scale of work and the space. Send floor photos and the layout, and we can discuss the right time to do the waterproofing with minimal work interruption.
What do you do if the drain is blocked under an industrial kitchen?
We first examine the drain via photos and description. If we find a blockage or pipe problem, we fix it before applying waterproofing to achieve a lasting result. Photos help with initial diagnosis.
Do you offer kitchen waterproofing in First Industrial Area?
Yes. First Industrial Area is within our service area in the Eastern Province, and we also work in Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan). Call us or send photos of the spot on WhatsApp.
Do the kitchen tiles have to be lifted to waterproof it?
If tiles are already down and the leak is under them, lifting the tiles is the better path to reach the surface and lay a proper waterproof layer before new tiles go on. If the surface is already open during renovation, waterproofing goes on before the tiles. Send photos on WhatsApp and we will advise for your situation.
Should I clear the kitchen before the work?
Yes. Appliances and furniture that can be moved should be cleared from the work area so the waterproofing reaches the full floor and its corners. A built-in dishwasher or a fixed unit is treated around carefully. When the scope of the work is agreed, we go through what needs to be cleared beforehand.
Can the kitchen be waterproofed with the old tiles still in place?
Some liquid waterproof layers can go over existing tiles if they are firm and the joints are sound, but the result is more limited than waterproofing on bare concrete. If the leak has reached below the tiles, lifting them is the better option. Photos help us assess the situation.
The same service in nearby areas
If the site is outside First Industrial Area, the same service is available in Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan).
More services in First Industrial Area



