
Bitumen bathroom waterproofing in Third Industrial Area
Bitumen bathroom waterproofing in the Third Industrial Area, Hofuf, begins with photos of the floor and wall bases, sent by call or WhatsApp. The area is made up of buildings with varied uses, and the treatment goes on before the screed and tiling.
The Third Industrial Area contains administrative blocks, service facilities and workshops, and its bathrooms vary in size and heavy use. Floors there are often exposed to wash water, so joints and drains come first in the waterproofing. The scope is set after the photos are reviewed, since a floor in a heavily used building may need more attention than another.
- The Third Industrial Area is a mixed facilities district in Hofuf, Al-Ahsa, close to the Second Industrial Area.
- Bathroom floors in heavily used facilities take far more wash water than those in homes.
What the service covers in Third Industrial Area
- Checking the concrete floor and wall bases and identifying cracks
- Closing the waterproofing around drain openings and pipe entries
- Confirming full drying before the screed is poured
- Applying bitumen layers over the floor including the shower area
The steps of bitumen bathroom waterproofing in Third Industrial Area
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Third Industrial Area and around itIncluding Second Industrial Area, Al Fasl and Industrial Area, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Third Industrial Area
Can a bathroom in a service building also be bitumen-treated?
Yes, bitumen is used on floors and wall bases in service buildings as in homes. The photos will show the right layer for the daily load.
Where does water usually escape in bathrooms in the industrial area?
Usually at floor-to-wall joints and around drains, which take repeated washing. Send photos of these points and we will review them with you.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Is Third Industrial Area within your service area?
Yes, Third Industrial Area is one of the areas we work in, as are Second Industrial Area, Al Fasl and Industrial Area. To start, call us or message us on WhatsApp.
The same service in nearby areas
We also offer bitumen bathroom waterproofing in Second Industrial Area, Al Fasl and Industrial Area, among the closest areas to Third Industrial Area.
More services in Third Industrial Area




