Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Raihan

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Raihan

Bathroom waterproofing in Ar Raihan begins with photos of the floor and wet walls sent by call or WhatsApp. We apply a continuous protective membrane on the surface before adhesive and tiles, to achieve lasting protection from moisture seepage.

Ar Raihan has houses, villas and apartment buildings with mostly relatively modern bathrooms. The sloped floor and joints between tiles may appear sound at first, but water from daily heavy use slowly creeps from under the tiles to lower layers. High humidity and hot weather accelerate poor seal failure, and hairline cracks around fixtures and pipes are weak points. A waterproof membrane creates a complete barrier under tiles that stops this seepage from the start, and photos show the surface condition and pipe locations to plan waterproofing precisely.

  • Ar Raihan is a district in the Eastern Province, near Al Maha, Al Badrani and Al Iskan, with houses, villas and apartment buildings.
  • A bathroom receiving daily steam and moisture needs comprehensive waterproofing because water easily penetrates any weak spot on the surface.
What the service includes

The scope of the work in Ar Raihan

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The steps of bathroom waterproofing before tiling in Ar Raihan

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Ar Raihan and around itIncluding Al Maha (near Mallahah), Al Badrani and Al Iskan (near Mallahah), as part of our work across the Eastern Province.

Start from Ar Raihan with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Raihan

Must old tiles be removed before waterproofing a bathroom in Ar Raihan?

This depends on the tile and substrate condition. If tiles are sound and well-bonded we may work over them after cleaning, but if they are weak or cracked we must remove damaged areas. Photos show us the condition clearly and we tell you what is needed.

How do we prevent water leaking from a new bathroom in Ar Raihan?

By applying effective waterproofing before tiles. A waterproof membrane covers the floor and wet walls with no gaps, preventing water from escaping the bathroom. Correct waterproofing from the start is the reliable way. Send photos of the bathroom and let us choose the best waterproofing method.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Do you cover Ar Raihan?

Yes. We serve Ar Raihan and nearby areas such as Al Maha (near Mallahah), Al Badrani and Al Iskan (near Mallahah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Areas near Ar Raihan

If the site is outside Ar Raihan, the same service is available in Al Maha (near Mallahah), Al Badrani and Al Iskan (near Mallahah).

Other services in the area

More services in Ar Raihan

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Ar Raihan?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp