Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ad Dawasir

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ad Dawasir

Bathroom waterproofing before tiling in Ad Dawasir starts with photos sent via WhatsApp of the bathroom, floor and wet walls. This waterproofing protects homes and apartment buildings from water seepage, by laying a continuous membrane that lasts years before tiles are installed.

Ad Dawasir has homes with adjoining yards and residential apartment blocks, many with older construction requiring waterproofing that reaches the floor foundation. Bathrooms in these buildings often show moisture from below or the walls, especially if floors are cracked or the base is weak. Your photos clarify the concrete condition, cracks and moisture, so we choose material and membrane thickness suited to the case precisely.

  • Ad Dawasir is a district in the Eastern Province, near As Suq, As Salam and Dammam, with homes and residential apartment buildings.
  • Older homes in residential districts may need waterproofing extending to the foundation to prevent damp rising from soil beneath.
What the service includes

The scope of the work in Ad Dawasir

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
How we work

How we carry out bathroom waterproofing before tiling in Ad Dawasir

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Ad Dawasir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Ad Dawasir comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Ad Dawasir

Can a bathroom be waterproofed without breaking up the old floor in Ad Dawasir?

It depends on floor condition. If the concrete is sound and the tiles are tight, it may be possible, but photos and inspection show the actual state and the right solution.

If an old bathroom has damp from below, how is it treated?

We remove the tiles and adhesive, repair cracks and the base, then apply new waterproofing extending to the foundation to block rising damp, then retile.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Ad Dawasir within your service area?

Yes, Ad Dawasir is one of the areas we work in, as are As Suq, As Salam (near Dammam) and Dammam. To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ad Dawasir, the same service is available in As Suq, As Salam (near Dammam) and Dammam.

Other services in the area

More services in Ad Dawasir

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Ad Dawasir:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp