Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in As Suq

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in As Suq

Bathroom waterproofing before tiling in As Suq starts with photos of the floor and walls, sent by call or WhatsApp. As Suq sits in Al-Ahsa among mixed residential and small commercial buildings, and its bathrooms differ in age and layout.

As Suq has older homes and newer ones, alongside small buildings where flats and shops sit together. Bathrooms are usually built over concrete slabs, and damp tends to gather at the corners and around the floor drain. In older bathrooms the joints are more prone to cracking, while newer ones need a continuous membrane under the tiles. The photos decide the right method for each bathroom.

  • As Suq is a district in Al-Ahsa in the Eastern Province, lying close to Dammam, Ad Dawasir and Al Adamah.
  • A bathroom tiled without a continuous membrane lets water reach the joints, and the fault rarely shows until months later.
What the service includes

The bathroom waterproofing before tiling work in As Suq

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

The steps of bathroom waterproofing before tiling in As Suq

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from As Suq comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve As Suq and around itIncluding Dammam, Ad Dawasir and Al Adamah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in As Suq

Can a bathroom in a mixed-use building in As Suq be waterproofed?

Yes, although it depends on where the bathroom sits in the building and what is above it. Send a picture of the floor and, if possible, what lies beneath, so we can tell whether the work can be done from inside without disturbing other parts.

Do we need to remove the old tiles in As Suq before waterproofing?

Not always, since sound old tiles without bulging can sometimes be worked over. The photos show whether removal is needed to expose the base.

How do I request bathroom waterproofing before tiling in As Suq?

Call us, or send clear photos of the spot and its location in As Suq on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

We also offer it in neighbouring areas

If the site is outside As Suq, the same service is available in Dammam, Ad Dawasir and Al Adamah.

Other services in the area

More services in As Suq

Worker applying the white insulation layer on a villa roof by the sea

Your first step in As Suq:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp