Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ad Dawasir

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ad Dawasir

Bathroom waterproofing in Ad Dawasir starts with photos of the floor and lower walls sent by call or WhatsApp. The district has family homes and residential blocks, and their bathrooms need protection from moisture before screed and tiling.

Bathrooms in Ad Dawasir range from older to newer designs, but all face the same moisture and water challenges. A bathroom floor must be waterproofed before screed and tile are laid, starting with surface cleaning and bitumen applied to the concrete base. Lower walls to a certain height need the same protection, especially around likely leak points at corners and joints. Your photos show exactly where problems are and how we achieve proper waterproofing.

  • Ad Dawasir is a district in the Eastern Province, close to As Suq, As Salam and Dammam, mixing homes and residential blocks.
  • Bitumen creates a water-resistant barrier on raw concrete before any top covering.
What the service includes

What the service covers in Ad Dawasir

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
How we work

From first contact to the finished job in Ad Dawasir

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Ad Dawasir and around itIncluding As Suq, As Salam (near Dammam) and Dammam, as part of our work across the Eastern Province.

Your request from Ad Dawasir comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Ad Dawasir

Why must a bathroom floor be waterproofed before tiling and not after?

Water seeps under the tile and screed into concrete and brick. Waterproofing from below stops water reaching the structures underneath and prevents dampness and cracking. By the time tiling is done, seepage has begun.

Does bitumen last long in Ad Dawasir bathrooms?

When applied properly to a clean, dry surface and before screed and tile, it functions for many years. The quality of preparation and application determines the lifespan, and your photos help us choose the best method for your case.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is Ad Dawasir within your service area?

Yes, Ad Dawasir is one of the areas we work in, as are As Suq, As Salam (near Dammam) and Dammam. To start, call us or message us on WhatsApp.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in As Suq, As Salam (near Dammam) and Dammam, among the closest areas to Ad Dawasir.

Other services in the area

More services in Ad Dawasir

Pool at night with water jets after waterproofing

In Ad Dawasir and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Ad Dawasir, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp