Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Hijaz

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Hijaz

Bathroom waterproofing in Al Hijaz begins with a message and photos sent by call or WhatsApp. The district has houses and villas of varying age, with bathrooms that may be prone to leaks and damp due to climate or construction.

Al Hijaz is a residential district with varied houses and villas of different size and age, some old and others new. In an old house, damp often appears in the bathroom first at drain openings and pipes, then spreads to the walls. A new villa may need waterproofing from the first stage. Seasonal humidity strongly affects bathrooms without tight protection. Photos help us understand the current state and the likely cause of the leak.

  • Al Hijaz is a district in the Eastern Province, near Makkah, Al Fanatir and Darin, with residential houses and villas.
  • Old pipes in a house in Al Hijaz can cause water leaks whose source is hard to pinpoint without clear photos.
What the service includes

What the service covers in Al Hijaz

  • Closing the drain opening ring and the bathroom door threshold
  • Leaving the layer to cure before any finish goes over it
  • Applying a continuous waterproof layer rising at walls and corners
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

The stages of the work in Al Hijaz

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Bathroom waterproofing in Al HijazWe choose the method and the materials once we know the condition of the spot.

We serve Al Hijaz and around itIncluding Makkah, Al Fanatir and Darin (near Al Fadili), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Hijaz

When is the best time to waterproof a new bathroom in Al Hijaz?

Right before tiling, when the concrete and substrate are exposed. Don't wait until construction is finished. If you are in the building phase, tell us so we can help at the right time.

Does damp in a bathroom wall in Al Hijaz always come from below ground?

Not always. It could be from leaking pipes, weak original waterproofing or seasonal humidity. Photos show exactly where the damp is and what signs go with it, helping us find the cause.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Do you cover Al Hijaz?

Yes. We serve Al Hijaz and nearby areas such as Makkah, Al Fanatir and Darin (near Al Fadili), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Makkah, Al Fanatir and Darin (near Al Fadili).

Other services in the area

More services in Al Hijaz

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Al Hijaz?
Call us now

Call us or send photos of the floor and wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp