
Bathroom waterproofing before tiling in Al Hijaz
Bathroom waterproofing in Al Hijaz starts with a call or WhatsApp photos of the existing bathroom floor and walls. The district mixes smaller houses with larger villas, all needing a continuous membrane before any new tiles are laid.
Hijaz houses are mostly older and medium-sized, with newer villas added later, and bathrooms varying greatly in age and condition. An old bathroom may have a damp floor or one clearly recessed below the adjacent room, needing a membrane that extends to that room's wall too. A newer bathroom may only need the membrane without extra digging or construction. Coastal humidity and nearness to the port mean any weakness in the membrane can cause lasting problems. Photos show what must be done before tiling starts.
- Al Hijaz is a district in the Eastern Province near Makkah, Al Fanatir and Darin, with houses and villas of varying sizes.
- A bathroom above a living room in an older house may leak water beneath the floor within weeks if the membrane is not complete.
What we do for you in Al Hijaz
- Cleaning the surface, removing loose parts and treating hairline cracks
- Sealing around the drain outlet, the door threshold and all pipe sleeves
- Checking the floor, the render, the corners, the drain outlet and pipe sleeves
- Forming and treating the floor-to-wall corners before the main layer
From first contact to the finished job in Al Hijaz
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.
Your request from Al Hijaz comes to usCall or WhatsApp on one number, and we answer you ourselves.
Bathroom waterproofing before tiling in Al HijazWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bathroom waterproofing before tiling in Al Hijaz
Can the waterproof membrane be applied in an Al Hijaz bathroom without replacing the existing pipes?
Yes, in most cases existing pipes stay as they are and the membrane is applied around them. But if photos show leaking pipes or corrosion, we will tell you repairs are needed before the membrane.
Does the waterproof membrane stop damp from the outer walls in an Al Hijaz bathroom?
The membrane protects against water from the toilet, shower and basin, but damp from outside needs separate treatment on the wall itself. Send photos of the bathroom and outer wall if possible so we can judge whether there is external damp.
Does the surface need to be completely dry before the membrane is applied?
Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.
What decides the cost of waterproofing a bathroom before tiling?
The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.
What should I send you from Al Hijaz?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hijaz, and we will work out the next step with you.
How high up the wall does the membrane go?
It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.
Areas near Al Hijaz
We also offer bathroom waterproofing before tiling in Makkah, Al Fanatir and Darin (near Al Fadili), among the closest areas to Al Hijaz.
More services in Al Hijaz



