Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Makkah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Makkah

Bathroom waterproofing before tiling in Makkah begins with photos of the floor and wet-area walls, sent by call or WhatsApp. We serve the Makkah district of the Eastern Province, close to Al Fanatir, Najd and Al Hijaz, an area of family houses mixed with small multi-storey buildings. A continuous membrane is laid before adhesive and tiles, and the photos decide how much preparation the surface needs.

The Makkah district mixes family houses on individual plots with smaller multi-storey buildings, so a bathroom often sits on an upper floor above other homes. A leak through an upper bathroom floor can appear as damp on the ceiling below, which makes a full membrane under the tiles more important than a surface coat. Shower areas and their junction with the wall need particular attention. The photos help us judge whether the existing screed is ready to receive the membrane.

  • Makkah is a district in the Eastern Province, close to Al Fanatir, Najd and Al Hijaz.
  • Water from an upper bathroom often shows first as damp on the ceiling below.
What the service includes

The main items of bathroom waterproofing before tiling in Makkah

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

How we carry out bathroom waterproofing before tiling in Makkah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Bathroom waterproofing before tiling in MakkahWe choose the method and the materials once we know the condition of the spot.

Start from Makkah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Makkah

Does a shower area in Makkah need extra membrane work?

Usually yes, because the shower floor and its junction with the wall take the most water. The membrane is carried up the walls around the shower, and the photos show where the junctions and drain sit.

Can the membrane go over an old screed in Makkah?

Often it can, if the screed is firm and free of hollow patches. We check the photos for cracks and loose areas, and anything unsound is repaired before the membrane is laid over it.

Do you offer bathroom waterproofing before tiling in Makkah?

Yes. Makkah is within our service area in the Eastern Province, and we also work in Al Fanatir, Najd and Al Hijaz. Call us or send photos of the spot on WhatsApp.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

Areas near Makkah

We also offer bathroom waterproofing before tiling in Al Fanatir, Najd and Al Hijaz, among the closest areas to Makkah.

Other services in the area

More services in Makkah

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Makkah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp