Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Fanatir

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Fanatir

Bathroom waterproofing in Al Fanatir starts with a photo of the floor, the wall base and the drain, sent by call or WhatsApp. We work on bathrooms under construction before tiles go in, and on existing bathrooms that show damp.

Al Fanatir is made up of scattered residential homes, many of them standalone houses whose bathrooms may sit some distance from the main pipework. In older bathrooms damp tends to show at the corners and around the drain, while in newer ones checking floor fall is more important. We see all of this in the photos before settling on how to handle the bathroom.

  • Al Fanatir is a residential district in Riyadh, with Makkah, Najd and Sudayr nearby, and standalone homes predominate.
  • The corner between floor and wall in a small bathroom gathers more water than many expect.
What the service includes

What the service covers in Al Fanatir

  • Applying a continuous waterproof layer rising at walls and corners
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Checking the floor, wall bases, corners and the drain opening
How we work

From first contact to the finished job in Al Fanatir

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Your request from Al Fanatir comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Fanatir and around itIncluding Makkah, Najd and Sudayr, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing in Al Fanatir

Do you waterproof a standalone house bathroom in Al Fanatir before tiling?

Yes, if the bathroom is still being built. Send a photo of the floor as it stands, so we can see the right stages and explain them to you.

What decides how deep the treatment goes in a bathroom in Al Fanatir?

The condition of the joints and the drain, and how far the damp has reached beneath the floor. These are judged from the photos before any decision.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Do you cover Al Fanatir?

Yes. We serve Al Fanatir and nearby areas such as Makkah, Najd and Sudayr, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Nearby areas

The same service in nearby areas

If the site is outside Al Fanatir, the same service is available in Makkah, Najd and Sudayr.

Other services in the area

More services in Al Fanatir

Two workers on the roof insulating around an AC unit

In Al Fanatir and need bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor and wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp