Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Hamra First District

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Hamra First District

We provide bathroom waterproofing in Al Hamra First District, Hofuf, covering floors, wall bases and drain openings, either during construction or after tiling. Start by sending photos of the bathroom by call or WhatsApp.

The district is mostly made up of detached houses, villas and small residential buildings, with bathrooms ranging from newly built to well used. In older bathrooms damp usually appears at wall bases and around drains, while newer ones are best lined before tiles go down. The work depends on what the photos reveal about the floor and joints.

  • Al Hamra First District is a residential district in Hofuf, Eastern Province, lying next to Al Hamra Second District and Al Aziziyah First District.
  • Damp in bathrooms usually enters through small joints rather than the middle of the floor, so inspection often starts there.
What the service includes

The bathroom waterproofing work in Al Hamra First District

  • Closing the drain opening ring and the bathroom door threshold
  • Leaving the layer to cure before any finish goes over it
  • Checking the floor, wall bases, corners and the drain opening
  • Cleaning the surface and treating hairline cracks and pipe entries
How we work

This is how we work in Al Hamra First District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Start from Al Hamra First District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Hamra First District and around itIncluding Al Hamra Second District, Al Aziziyah First District and Government Departments Complex Second District, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing in Al Hamra First District

Can an old bathroom in Al Hamra First District be waterproofed without removing the tiles?

That depends on the tiles and the floor beneath them. The photos will show whether lining over the existing tiles is possible or part of them must come up.

What should I send you about my bathroom in Al Hamra First District?

Send photos of the floor, the wall bases and the drain opening, with a brief note of where you have noticed damp. This helps us choose the right system before any work begins.

Do you offer bathroom waterproofing in Al Hamra First District?

Yes. Al Hamra First District is within our service area in the Eastern Province, and we also work in Al Hamra Second District, Al Aziziyah First District and Government Departments Complex Second District. Call us or send photos of the spot on WhatsApp.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Hamra First District, in Al Hamra Second District, Al Aziziyah First District and Government Departments Complex Second District.

Other services in the area

More services in Al Hamra First District

Two workers on the roof insulating around an AC unit

In Al Hamra First District and need bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp