Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Hamra First District

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Hamra First District

Bathroom waterproofing before tiling in Al Hamra First District begins with photos of the floor and wet-area walls, sent by call or WhatsApp. Many homes here are villas, and a membrane laid before adhesive and tiles keeps water out of the structure beneath.

Al Hamra First District is made up largely of houses and villas, with some apartment floors in the same streets. Bathrooms in older villas were often tiled directly over a plain screed, so the first question is what lies beneath the tiles. Floors above a living space carry water down to the ceiling below, so the membrane must turn up the walls rather than stop at the floor. The photos show how sound the existing tiles are, and if they are sound we will tell you whether they can stay in place.

  • Al Hamra First District is a district in the Eastern Province, close to Al Aziziyah First District and the Government Departments Complex.
  • Bathroom floors above living spaces need the membrane turned up the walls to protect the ceiling below.
What the service includes

What the service covers in Al Hamra First District

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

This is how we work in Al Hamra First District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Bathroom waterproofing before tiling in Al Hamra First DistrictWe choose the method and the materials once we know the condition of the spot.

Your request from Al Hamra First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Hamra First District

Can tiles stay in place during bathroom waterproofing?

Sometimes, if the existing tiles are sound and firmly bonded. Photos of the floor and walls will show whether they can stay, or whether they need to come up before the membrane is laid.

Does the waterproofing cover the walls as well as the floor?

Yes, the membrane continues up the wet-area walls to the height the splash reaches, so water cannot seep behind the tiles. The exact height is set from the photos you send for a home in this district.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Do you offer bathroom waterproofing before tiling in Al Hamra First District?

Yes. Al Hamra First District is within our service area in the Eastern Province, and we also work in Al Hamra Second District, Al Aziziyah First District and Government Departments Complex Second District. Call us or send photos of the spot on WhatsApp.

Nearby areas

Areas near Al Hamra First District

Nearby areas we also cover: Al Hamra Second District, Al Aziziyah First District and Government Departments Complex Second District.

Other services in the area

More services in Al Hamra First District

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Hamra First District?
Call us now

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp