Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Hamra Second District

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Hamra Second District

Bathroom waterproofing in Al Hamra Second District begins with photos of floors, walls and openings sent to us by call or WhatsApp. The district has apartment blocks and villas, and their bathrooms face constant moisture and standing water.

Al Hamra Second District has a mix of older and newer apartment blocks and villas on close plots. Bathrooms in older blocks often show concrete cracks and drainage problems, while newer ones may need protection renewed around pipes. Walls and floors constantly exposed to water require reliable waterproofing to stop dampness spreading to adjoining rooms. Photos show the state of each bathroom and what it actually needs.

  • Al Hamra Second District is a residential area in the Eastern Province between Al Hamra Third and First districts, with diverse apartment blocks and buildings.
  • Bathrooms in apartment units share walls with other bathrooms, so moisture can travel through cracks to neighbouring units.
What the service includes

What the service covers in Al Hamra Second District

  • Closing the drain opening ring and the bathroom door threshold
  • Leaving the layer to cure before any finish goes over it
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Checking the floor, wall bases, corners and the drain opening
How we work

From first contact to the finished job in Al Hamra Second District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Al Hamra Second District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Hamra Second District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Hamra Second District

Is bathroom waterproofing a problem in older apartment blocks in Al Hamra Second District?

Often it is, since the original waterproofing may be weak or damaged. Send photos so we can see dampness and cracks; later waterproofing is possible but depends on where the leak is and the floor type.

Can dampness from a bathroom spread to the bedroom next to it in Al Hamra Second District?

Yes, if there is not enough waterproofing or the shared walls are damaged. Photos show how far the dampness spreads, and we may need to waterproof the walls on the bathroom side to stop it.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

How do I request bathroom waterproofing in Al Hamra Second District?

Call us, or send clear photos of the spot and its location in Al Hamra Second District on WhatsApp, and we will work out the next step with you.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Nearby areas

The same service in nearby areas

If the site is outside Al Hamra Second District, the same service is available in Al Hamra Third District, Al Hamra First District and Government Departments Complex Second District.

Other services in the area

More services in Al Hamra Second District

Two workers on the roof insulating around an AC unit

We start with you in Al Hamra Second District
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp