Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Hadabah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Hadabah

Bathroom waterproofing in Al Hadabah begins with photos of the floor, wall base and drain, sent by call or WhatsApp. We serve this district of the Eastern Province, which lies close to Al Fursan, Al Matar and Al Iskan Al Shimali, and which often has relatively newer buildings and villas within housing schemes.

Al Hadabah has relatively newer residential blocks and villas within organised housing schemes, and most of its bathrooms were finished soon after the structure. Waterproofing during construction is therefore usually simpler, because the protective layer goes in before the tiles. In bathrooms that are already tiled, the real leak point must be identified, and it may sit at the floor and wall junction or around the shower drain. The final approach depends on what the photos show for each bathroom.

  • Al Hadabah is a residential district in the Eastern Province, lying close to Al Fursan, Al Matar and Al Iskan Al Shimali.
  • Most bathroom leaks start at the floor to wall joint or around the shower drain.
What the service includes

What the service covers in Al Hadabah

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Applying a continuous waterproof layer rising at walls and corners
  • Leaving the layer to cure before any finish goes over it
How we work

The stages of the work in Al Hadabah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Bathroom waterproofing in Al HadabahWe choose the method and the materials once we know the condition of the spot.

Start from Al Hadabah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing in Al Hadabah

Can the source of a leak in a tiled bathroom be found from photos alone?

Photos help a great deal in narrowing down the likely spot, but the final judgement depends on what they show of the grout and joints. If the photos are not enough, we will tell you what else is needed before any work starts.

Is waterproofing during construction in Al Hadabah different from work after tiling?

Yes, waterproofing before tiling lets the protective layer sit fully under the floor and up the walls. After tiling the work is done from the existing surface, and the photos will show which of the two suits your bathroom.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Is Al Hadabah within your service area?

Yes, Al Hadabah is one of the areas we work in, as are Al Fursan, Al Matar (near An Nabiyah) and Al Iskan Al Shimali. To start, call us or message us on WhatsApp.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Fursan, Al Matar (near An Nabiyah) and Al Iskan Al Shimali.

Other services in the area

More services in Al Hadabah

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Al Hadabah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp