Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Fursan

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Fursan

Bathroom waterproofing in Al Fursan begins with a WhatsApp message containing photos of the floor, walls and drains. The district includes villas and multi-storey houses, some newer and some older, where the bathroom may need new waterproofing or repair of an existing leak.

Al Fursan has houses of varying ages and sizes, so bathroom problems are diverse. An older house may suffer from chronic leaks or damp in the bathroom's lower walls, while a newer one may need preventive waterproofing before tiling. Water from pipes, drains and daily showers stress the bathroom structure, especially if it sits above a bedroom or store. Photos show whether a leak is happening now or could happen.

  • Al Fursan is a district in the Eastern Province, near Al Iskan Al Shimali, Ash Shrouk and Al Hadabah, with multi-storey houses and villas.
  • Bathrooms in multi-storey houses need strong waterproofing to prevent water seeping to lower floors.
What the service includes

The scope of the work in Al Fursan

  • Leaving the layer to cure before any finish goes over it
  • Applying a continuous waterproof layer rising at walls and corners
  • Closing the drain opening ring and the bathroom door threshold
  • Checking the floor, wall bases, corners and the drain opening
How we work

The steps of bathroom waterproofing in Al Fursan

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Start from Al Fursan with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing in Al FursanWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing in Al Fursan

Does a bathroom leak in Al Fursan affect the floor below it?

Yes, a leak can spread to the floor below if the bathroom is not waterproofed adequately. Send photos of any damp marks below so we can assess the problem and how deep the leak goes.

What is the best way to waterproof a new bathroom in a villa in Al Fursan?

Waterproofing before tiling gives the strongest protection. We treat the floor, walls, corners and drains in a way that protects against moisture and future leaks.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Is Al Fursan within your service area?

Yes, Al Fursan is one of the areas we work in, as are Al Iskan Al Shimali, Ash Shrouk (near An Nabiyah) and Al Hadabah. To start, call us or message us on WhatsApp.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Nearby areas

Areas near Al Fursan

If the site is outside Al Fursan, the same service is available in Al Iskan Al Shimali, Ash Shrouk (near An Nabiyah) and Al Hadabah.

Other services in the area

More services in Al Fursan

Two workers on the roof insulating around an AC unit

We start with you in Al Fursan
with one call

Call us or send photos of the floor and wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp