Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Fursan

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Fursan

Bathroom sealing before tiling in Al Fursan begins with photos of your bathroom sent by call or WhatsApp. The district is residential with villas and multi-storey buildings, each requiring a continuous waterproof layer before tiles are fitted.

Al Fursan has apartment blocks and villas of various ages and designs, each with bathrooms that differ in size and finish. A block often has several bathrooms of different sizes, while a villa may have a master bathroom and additional ones. Water and humidity in the bathroom can saturate the tiles if there is no sealing beneath, and the waterproof membrane stops moisture from being drawn up from the concrete. Photos show the actual state of your bathroom and wet areas so we can pick the right solution with you.

  • Al Fursan is a district in the Eastern Province near Al Iskan Al Shimali, Ash Shrouk and Al Hadabah, with varied residential buildings.
  • A flat's bathroom is fully enclosed with daily high humidity, so waterproofing beneath the tiles prevents water seeping into walls and floors.
What the service includes

The main items of bathroom waterproofing before tiling in Al Fursan

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The stages of the work in Al Fursan

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Al Fursan with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Fursan comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Fursan

Is bathroom sealing different in a villa compared to a flat in Al Fursan?

The same waterproof membrane is used in both, but the space and layout may differ. A villa might have a larger bathroom with a different design, whilst a flat is smaller. Photos clarify your situation and help us choose the method.

When should bathroom waterproofing be started before tiling?

After the basic work is done in the bathroom, the floor and walls are level, and before adhesive and tiles are laid. Photos show what stage your bathroom is at so we can tell you what comes next.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Do you offer bathroom waterproofing before tiling in Al Fursan?

Yes. Al Fursan is within our service area in the Eastern Province, and we also work in Al Iskan Al Shimali, Ash Shrouk (near An Nabiyah) and Al Hadabah. Call us or send photos of the spot on WhatsApp.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Fursan, in Al Iskan Al Shimali, Ash Shrouk (near An Nabiyah) and Al Hadabah.

Other services in the area

More services in Al Fursan

Worker applying the white insulation layer on a villa roof by the sea

In Al Fursan and need bathroom waterproofing before tiling?
Send us photos of the spot

Describe the problem and where it is in Al Fursan, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp