Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Bustan Two

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Bustan Two

Bathroom waterproofing in Al Bustan Two begins with photos of the floor, walls and drain openings sent by call or WhatsApp. The district has modern villas and medium-sized houses needing strong protection from water leakage.

Al Bustan Two has relatively modern residential buildings and villas of various sizes, so bathroom designs and dimensions vary. New bathrooms may benefit from preventive waterproofing before tiling to ensure longevity, while some may need mid-stage repair if early dampness appears. Water can seep from around showers, pipes or at floor-wall joints. Clear photos show the scope of the problem and whether dampness is surface or deep.

  • Al Bustan Two is a district in the Eastern Province, close to Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, with modern residential buildings.
  • New villas in newer districts may benefit from preventive waterproofing before tiles are installed to avoid future problems.
What the service includes

What the service covers in Al Bustan Two

  • Checking the floor, wall bases, corners and the drain opening
  • Applying a continuous waterproof layer rising at walls and corners
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Leaving the layer to cure before any finish goes over it
How we work

The stages of the work in Al Bustan Two

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Bathroom waterproofing in Al Bustan TwoWe choose the method and the materials once we know the condition of the spot.

Start from Al Bustan Two with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing in Al Bustan Two

Can a new bathroom in Al Bustan Two be waterproofed before tiles are installed?

Yes, and this is ideal. Waterproofing before tiles fully protects the base and prevents future damp problems. Send photos of the bathroom before tiling begins so the team can plan the work.

If the bathroom is new but minor dampness appears, can it be fixed?

Often yes. Minor, localized dampness may stem from a weak joint or poorly sealed area. Photos show the exact location, and we can usually treat that specific spot without removing all the tiles.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Do you cover Al Bustan Two?

Yes. We serve Al Bustan Two and nearby areas such as Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing in Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, among the closest areas to Al Bustan Two.

Other services in the area

More services in Al Bustan Two

Two workers on the roof insulating around an AC unit

We start with you in Al Bustan Two
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp