
Tanks & roofs together in Umm Ghawr
In Umm Ghawr we waterproof overhead tanks and the roofs beneath and around them, starting from photos sent by call or WhatsApp that show the joints, stands and pipe entries. Tanks and roofs are handled together because a leak between them often passes through the same point.
Umm Ghawr is a village where scattered houses with open roofs predominate, and its tanks usually stand on the roof or on a stand close by. As joints age, cracks form around the stand and pipe entries, and damp rises into the ceilings. We therefore treat the lining and joints according to what the photos reveal, without assuming every house is the same.
- Umm Ghawr is a village in Al-Ahsa in the Eastern Province, close to Ar Rabiyah, Al Kawthar and Ar Rayaan.
- Pipe entries on a tank roof are among the points that leak over time, as the material around them expands and contracts.
The main items of tanks & roofs together in Umm Ghawr
- Sealing pipe entries, the AC base, drain openings and the parapet
- Checking the seal at the tank base before the tank is put back in use
- Lining the tank with a layer suited to its type and condition
- Cleaning the tank inside and treating cracks and joints
How we carry out tanks & roofs together in Umm Ghawr
Send photos of the tank and roof
On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.
Inspect and prepare
The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.
Waterproof the tank, then the roof around it
The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.
Cure and hand over
The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.
Why Abraj Al Azl?
Keeping water off the reinforcementWater that reaches the reinforcement in the slab weakens it over time. Treating the source early stops that process.
Umm Ghawr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Umm Ghawr with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on tanks & roofs together in Umm Ghawr
Do you waterproof an exposed tank on a house roof in Umm Ghawr?
Yes, we serve Umm Ghawr. Send a photo of the tank and the roof and tell us how the tank stands, and we will work out with you whether the stand, the pipes or the whole roof need treatment.
What do you do if the roof stays wet after rain?
We start by identifying the source of the moisture from the photos and your description, since wetness on a roof can come from joints, the tank or the slope. We then suggest the method that fits each case.
Which points on the roof around the tank are waterproofed?
The slab surrounding the tank base is waterproofed and the layer turns up at the tank wall. Supply and drain pipe entries are sealed, and the AC base, drain openings and parapet are treated depending on their condition and how close they are to the tank. The roof work completes the tank waterproofing; it does not replace it.
Can the tank and roof be waterproofed without removing the roof tiles?
It depends on the tile condition and how deep the leak has gone. If the tiles are firm and their joints are sound and the water has not reached beneath them, treatment from above may suit depending on the layer type. If the tiles are loose, their joints have broken down or water has reached below them, they are lifted, the surface is waterproofed and the tiles are relaid. Send photos and we will advise.
Does the tank need to be empty before the work starts?
Yes. The inside walls cannot be cleaned, cracks treated or a waterproof layer applied while the tank is full. The tank is emptied and cleaned before the work starts, and refilled once the layers have dried and set. We agree the timing of emptying in advance.
Is Umm Ghawr within your service area?
Yes, Umm Ghawr is one of the areas we work in, as are Ar Rabiyah (near Umm Ghawr), Al Kawthar (near Ar Rafiah) and Ar Rayaan (near Al Adhiriyah). To start, call us or message us on WhatsApp.
Areas near Umm Ghawr
Nearby areas we also cover: Ar Rabiyah (near Umm Ghawr), Al Kawthar (near Ar Rafiah) and Ar Rayaan (near Al Adhiriyah).
More services in Umm Ghawr




