
Tanks & roofs together in Gharb An Nabiyah
Tank and roof treatment in West An Nabiyah starts with photos of the overhead tank, its stand and the pipe entries, sent by call or WhatsApp. The district lies near An Nabiyah, Ar Rimal and Al Jish, with a mix of villas and apartment blocks.
West An Nabiyah mixes detached villas with small apartment blocks, so the tank sits on a flat roof in villas and on the top roof in blocks. Summer heat can stress exposed material, and damp can keep lower roofs wet in humid months. The photos show the condition of each surface before a lining method is chosen.
- West An Nabiyah is a district of Dammam in the Eastern Province, near An Nabiyah and Ar Rimal.
- Exposed roof material expands and contracts with heat, so cracks appear first at the joints.
The tanks & roofs together work in Gharb An Nabiyah
- Checking the tank base, the surrounding slab and locating the leak points
- Checking the seal at the tank base before the tank is put back in use
- Lining the tank with a layer suited to its type and condition
- Extending the waterproof layer across the roof surrounding the tank
The steps of tanks & roofs together in Gharb An Nabiyah
Send photos of the tank and roof
On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.
Inspect and prepare
The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.
Waterproof the tank, then the roof around it
The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.
Cure and hand over
The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.
Why Abraj Al Azl?
Keeping water off the reinforcementWater that reaches the reinforcement in the slab weakens it over time. Treating the source early stops that process.
Gharb An Nabiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Your request from Gharb An Nabiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book tanks & roofs together in Gharb An Nabiyah
Does treatment differ between villas and blocks in West An Nabiyah?
Yes, because villas usually have one open roof while blocks share a top roof among several tenants. The photos will show which case applies to you.
Does damp in West An Nabiyah need special treatment?
Damp needs its source checked first, whether from the roof or the joints. We determine this from the photos before any lining is applied.
Do you cover Gharb An Nabiyah?
Yes. We serve Gharb An Nabiyah and nearby areas such as An Nabiyah, Ar Rimal and Al Jish (near Mallahah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Does the tank need to be empty before the work starts?
Yes. The inside walls cannot be cleaned, cracks treated or a waterproof layer applied while the tank is full. The tank is emptied and cleaned before the work starts, and refilled once the layers have dried and set. We agree the timing of emptying in advance.
Which points on the roof around the tank are waterproofed?
The slab surrounding the tank base is waterproofed and the layer turns up at the tank wall. Supply and drain pipe entries are sealed, and the AC base, drain openings and parapet are treated depending on their condition and how close they are to the tank. The roof work completes the tank waterproofing; it does not replace it.
What decides the cost of waterproofing the tank and the roof together?
The tank size, the number of floors, the slab condition, the existing cracks, how much of the roof needs treatment, the number of pipe entries and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will set the scope.
The same service in nearby areas
We also work near Gharb An Nabiyah, in An Nabiyah, Ar Rimal and Al Jish (near Mallahah).
More services in Gharb An Nabiyah




