Abraj Al AzlContracting
Call العربية
Worker waterproofing a villa roof slab around the base of a water tank

Tanks & roofs together in At Tawbi (near Ad Doij)

Tank and roof, one job

Waterproofing for the overhead tank, its stand, pipe entries and the surrounding roof

+966 54 311 2066
The service in your area

Tanks & roofs together in At Tawbi (near Ad Doij)

In At Tawbi, Al Ahsa, we waterproof tanks and roofs together, starting from photos of the overhead tank, its stand, the pipe entries and the surrounding roof, sent by call or WhatsApp. The stand and surrounding roof are handled as part of one job.

At Tawbi is made up of houses, villas and residential buildings, with roofs that are either bare or treated some time ago. Damp generally starts at the joint between the tank and its stand or where pipes rise through the roof, then moves down into the wall. We check these points first and decide what is needed only after reviewing the photos.

  • At Tawbi is a district in Al Ahsa in the Eastern Province, near Ad Doij, Umm Al Jazm and Al Madaris.
  • Damp on the wall below a tank is often a trace of a leak that started at the stand or the roof.
What the service includes

The scope of the work in At Tawbi (near Ad Doij)

  • Lining the tank with a layer suited to its type and condition
  • Checking the tank base, the surrounding slab and locating the leak points
  • Sealing pipe entries, the AC base, drain openings and the parapet
  • Extending the waterproof layer across the roof surrounding the tank
How we work

This is how we work in At Tawbi (near Ad Doij)

1

Send photos of the tank and roof

On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.

2

Inspect and prepare

The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.

3

Waterproof the tank, then the roof around it

The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.

4

Cure and hand over

The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.

What sets us apart

Why Abraj Al Azl?

Keeping water off the reinforcementWater that reaches the reinforcement in the slab weakens it over time. Treating the source early stops that process.

At Tawbi (near Ad Doij) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Tanks & roofs together in At Tawbi (near Ad Doij)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on tanks & roofs together in At Tawbi (near Ad Doij)

Is wall damp in At Tawbi always caused by the tank?

Not always, as it can come from the roof, the pipes or other sources. The photos help us identify the source before any work begins.

Does the tank need emptying before treatment in At Tawbi?

Yes, the tank is emptied so the treatment can be applied to a dry, clean surface. We will tell you what is needed once we have reviewed the photos and the tank's condition.

What should I send you from At Tawbi (near Ad Doij)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in At Tawbi (near Ad Doij), and we will work out the next step with you.

Does the tank need to be empty before the work starts?

Yes. The inside walls cannot be cleaned, cracks treated or a waterproof layer applied while the tank is full. The tank is emptied and cleaned before the work starts, and refilled once the layers have dried and set. We agree the timing of emptying in advance.

What decides the cost of waterproofing the tank and the roof together?

The tank size, the number of floors, the slab condition, the existing cracks, how much of the roof needs treatment, the number of pipe entries and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will set the scope.

Is the same material used on the tank and on the roof?

Not necessarily. The tank needs a layer that withstands constant water contact and bonds well to concrete or fibreglass, while the surrounding roof needs a layer that handles sun and thermal movement. We choose the right material for each point based on the photos and the surface condition.

Nearby areas

We also offer it in neighbouring areas

If the site is outside At Tawbi (near Ad Doij), the same service is available in Ad Doij, Umm Al Jazm and Al Madaris.

Other services in the area

More services in At Tawbi (near Ad Doij)

Villa roof finished in white insulation with a glass railing over the sea

Your first step in At Tawbi (near Ad Doij):
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp