Abraj Al AzlContracting
Call العربية
Worker waterproofing a villa roof slab around the base of a water tank

Tanks & roofs together in Al Wurud Third District

Tank and roof, one job

Waterproofing for the overhead tank, its stand, pipe entries and the surrounding roof

+966 54 311 2066
The service in your area

Tanks & roofs together in Al Wurud Third District

Tank and roof waterproofing in Al Wurud Third District begins with photos of the overhead tank and roof, sent by call or WhatsApp. The district has established villas and apartment buildings alongside newer structures, with roofs supporting tanks that may be old or worn.

Al Wurud Third District shows clear variety between old and new buildings, each tank with its own issues. A tank on an older roof may suffer from settling or unevenness that traps water around it. The tank itself may have many years, and cracks in it may not be easily visible but leak under pressure. The surrounding roof may have low spots that collect water and allow moisture to seep to lower ceilings. Photos let us identify what needs treatment and choose the best solution for you.

  • Al Wurud Third District is a residential area in the Eastern Province, near As Suqur, Al Hada and Al Matar districts.
  • Uneven roofs in residential areas collect water and allow moisture to penetrate beneath tanks.
What the service includes

What the service covers in Al Wurud Third District

  • Cleaning the tank inside and treating cracks and joints
  • Checking the seal at the tank base before the tank is put back in use
  • Checking the tank base, the surrounding slab and locating the leak points
  • Extending the waterproof layer across the roof surrounding the tank
How we work

From first contact to the finished job in Al Wurud Third District

1

Send photos of the tank and roof

On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.

2

Inspect and prepare

The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.

3

Waterproof the tank, then the roof around it

The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.

4

Cure and hand over

The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.

What sets us apart

Why Abraj Al Azl?

Keeping water off the reinforcementWater that reaches the reinforcement in the slab weakens it over time. Treating the source early stops that process.

Tanks & roofs together in Al Wurud Third DistrictWe choose the method and the materials once we know the condition of the spot.

Your request from Al Wurud Third District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about tanks & roofs together in Al Wurud Third District

Must an old tank in Al Wurud Third be replaced or can it be repaired with sealing?

In many cases it can be repaired, if the concrete or metal has not suffered deep damage. Photos show the tank's true condition, and if the structure is sound, sealing protects it and stops leaks.

Why does water collect around the tank on my roof in Al Wurud Third?

The roof itself may be uneven or the tank not seated level. Pipe joints may leak from above. Photos make the cause clear, and then we decide whether to seal the tank or also fix the roof.

Is Al Wurud Third District within your service area?

Yes, Al Wurud Third District is one of the areas we work in, as are As Suqur District, Al Hada District and Al Matar District. To start, call us or message us on WhatsApp.

Is the same material used on the tank and on the roof?

Not necessarily. The tank needs a layer that withstands constant water contact and bonds well to concrete or fibreglass, while the surrounding roof needs a layer that handles sun and thermal movement. We choose the right material for each point based on the photos and the surface condition.

What decides the cost of waterproofing the tank and the roof together?

The tank size, the number of floors, the slab condition, the existing cracks, how much of the roof needs treatment, the number of pipe entries and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will set the scope.

Can the tank and roof be waterproofed without removing the roof tiles?

It depends on the tile condition and how deep the leak has gone. If the tiles are firm and their joints are sound and the water has not reached beneath them, treatment from above may suit depending on the layer type. If the tiles are loose, their joints have broken down or water has reached below them, they are lifted, the surface is waterproofed and the tiles are relaid. Send photos and we will advise.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: As Suqur District, Al Hada District and Al Matar District.

Other services in the area

More services in Al Wurud Third District

Villa roof finished in white insulation with a glass railing over the sea

Tanks & roofs together in Al Wurud Third District?
Call us now

Call us or send photos of the tank and the villa roof on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp