Abraj Al AzlContracting
Call العربية
Worker coating the roof slab beneath a clean roof tank on its stand

Overhead tank waterproofing in An Narjis

Your tank is leaking down

Waterproofing for overhead tanks on roofs and towers, covering the stand and pipe entries

+966 54 311 2066
The service in your area

Overhead tank waterproofing in An Narjis

Overhead tank waterproofing in An Narjis starts with photos of the tank, pipes and tower or roof sent by call or WhatsApp. The district has houses and villas of different ages, most fitted with overhead tanks on roofs or metal stands. The method depends on material type and fixing condition.

An Narjis has villas and apartment buildings of varying ages, with overhead tanks on roofs or independent metal stands. Older tanks may leak at joints and the base, and metals may have started to rust. Newer tanks may only need pipe and joint checks. Intense heat and variable humidity affect waterproofing durability. Photos clearly show location and condition.

  • An Narjis is a district in the Eastern Province, close to Al Awwamiyah, Az Zarah and Ath Thuraiya, with diverse villas and apartment buildings.
  • Overhead tanks face large temperature swings between night and day and across seasons, increasing pressure on the lining and joints.
What the service includes

The main items of overhead tank waterproofing in An Narjis

  • Applying a waterproof layer to the body and base according to where the leak is
  • Closing the waterproofing firmly around all pipe entries
  • Checking the tank body, its cracks, joints and base
  • Cleaning the inside and outside surfaces before work begins
How we work

The stages of the work in An Narjis

1

Send photos of the tank and the roof

On WhatsApp: photos of the tank body, its base, the pipe entries, the surrounding roof and any damp patches below, so we can read the extent of the leak and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned inside and out, then the body, the base and all pipe entries are inspected for cracks and open joints.

3

Treat cracks and joints

Hairline cracks, open joints, the edges of pipe entries and any nearby AC base are treated before the waterproof layer goes on, depending on the condition of each point.

4

Apply the layer and allow it to cure

The waterproof layer is applied to the tank body from the inside, the outside or both, according to where the leak is, closed firmly around each pipe entry and across the base, then left to dry and cure before the tank is refilled.

What sets us apart

Why Abraj Al Azl?

The tank stand lasts longerWater seeping at the base weakens the concrete beneath it. Treating the base with the tank protects the roof surface it stands on.

We serve An Narjis and around itIncluding Al Awwamiyah, Az Zarah and Ath Thuraiya, as part of our work across the Eastern Province.

Start from An Narjis with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about overhead tank waterproofing in An Narjis

What causes leaks from overhead tanks in An Narjis?

Leaks usually come from cracked joints, weak waterproofing or metal rust. Temperature and humidity swings worsen these causes. Photos show leak location and type to pick the right treatment.

Does a metal tower for the overhead tank need rust protection in An Narjis?

Yes, metals exposed to air and moisture rust over time. Cleaning rust and applying a protective layer slow deterioration. Regular checks help catch rust early.

What is the difference between waterproofing the tank inside and outside?

Waterproofing from the inside stops water leaving the tank and is the first choice when the leak goes outward. Waterproofing from the outside stops external moisture entering and can be added to protect the concrete from weather. In many cases both sides are needed, and we decide that after looking at the photos and the surface.

What decides the cost of waterproofing an overhead tank?

The size of the tank, the number of pipe entries, the condition of the concrete, how deep the cracks are, whether treatment is needed from one side or both, and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will advise the right treatment.

How do I request overhead tank waterproofing in An Narjis?

Call us, or send clear photos of the spot and its location in An Narjis on WhatsApp, and we will work out the next step with you.

Does the tank have to be emptied before waterproofing?

Yes. The tank must be fully emptied to clean the walls, check the cracks and joints and apply the waterproof layer to a clean surface. If the treatment is on the outside only the situation may differ, but photos guide us on what is needed before we arrive.

Nearby areas

The same service in nearby areas

If the site is outside An Narjis, the same service is available in Al Awwamiyah, Az Zarah and Ath Thuraiya.

Other services in the area

More services in An Narjis

Pool at night with water jets after waterproofing

Overhead tank waterproofing in An Narjis?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp