Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Sanabis (near Tarout)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Sanabis (near Tarout)

Epoxy tank lining in Sanabis begins when you send tank photos by WhatsApp or call us directly. Sanabis is a village with small homes and villas served by water tanks meeting daily household needs. Epoxy stops water loss through cracks and pores in the tank walls and floor.

Homes in Sanabis are small and fairly close together, with tanks usually on roofs or in small yards. The concrete here deals with temperature swings and relative dryness, causing minor cracks that allow steady seepage. Epoxy forms a tight barrier that prevents water from escaping and cuts long-term water loss. Photos help us determine the tank's age, condition and any weak spots needing special care.

  • Sanabis is a village in the Eastern Province, close to Al Jawharah, Ar Rabeiyah and As Sawari, with small close-set homes and villas.
  • Tanks in closely-grouped small villages are often relatively old, and water seepage builds up because preventive maintenance is rare.
What the service includes

The epoxy tank lining work in Sanabis (near Tarout)

  • Preparing the surface and leaving it completely dry
  • Treating hairline cracks and crumbling joints before application
  • Applying primer then epoxy coats across the full interior surface
  • Closing the coating around pipe entries and the drain opening
How we work

This is how we work in Sanabis (near Tarout)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Start from Sanabis (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Sanabis (near Tarout) and around itIncluding Al Jawharah (near Tarout), Sanabis (near An Narjis One) and Ar Rabeiyah (near Al Yamamah), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book epoxy tank lining in Sanabis (near Tarout)

Does epoxy replace repairing deep cracks in a Sanabis tank?

No, deep cracks must be repaired before epoxy is applied. Epoxy seals small cracks and pores, but large cracks need filling first. Photos will show us which cracks need separate treatment.

Can the tank water be used right after epoxy application in Sanabis?

No, epoxy needs complete drying before the tank is filled. The time depends on temperature and humidity. We will tell you when it is safe to use after work is done.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Is Sanabis (near Tarout) within your service area?

Yes, Sanabis (near Tarout) is one of the areas we work in, as are Al Jawharah (near Tarout), Sanabis (near An Narjis One) and Ar Rabeiyah (near Al Yamamah). To start, call us or message us on WhatsApp.

Nearby areas

Areas near Sanabis (near Tarout)

We also work near Sanabis (near Tarout), in Al Jawharah (near Tarout), Sanabis (near An Narjis One) and Ar Rabeiyah (near Al Yamamah).

Other services in the area

More services in Sanabis (near Tarout)

Worker rolling the white insulation layer onto a roof

In Sanabis (near Tarout) and need epoxy tank lining?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp