Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Qurayyah

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Qurayyah

In Qurayyah hamlet, epoxy tank lining begins with a WhatsApp message containing photos of the tank and its location. The hamlet consists of scattered dwellings and gardens, where most residents rely on a water tank to meet their annual water needs.

Dwellings in Qurayyah are loosely scattered amid open spaces, each with its own tank. Tanks here are often very old, exposed to sun and desert winds, and suffer constant water loss. The arid climate and intense heat accelerate concrete cracking, and epoxy provides long-term protection. Photos reveal the tank's age and both internal and external surface conditions before we choose the best approach.

  • Qurayyah is a hamlet in the Eastern Province, near Al Wahah, Qurtubah and Ar Rabwah, with scattered dwellings and small agricultural plots.
  • An old tank in an arid desert environment may lose significant water through concrete pores and cracks even if they appear very small.
What the service includes

The main items of epoxy tank lining in Qurayyah

  • Closing the coating around pipe entries and the drain opening
  • Preparing the surface and leaving it completely dry
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Treating hairline cracks and crumbling joints before application
How we work

The stages of the work in Qurayyah

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Qurayyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Qurayyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on epoxy tank lining in Qurayyah

Does our old tank in Qurayyah need cleaning before epoxy is applied?

Yes, cleaning is essential. Deposits, salt and algae must be removed from inside so epoxy adheres properly. We handle this as part of the process.

How often does epoxy lining need refreshing in Qurayyah?

It depends on water use and climate. Well-applied epoxy lasts many years. If you notice new leaks or coating damage, send photos and we will assess the situation.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

How do I request epoxy tank lining in Qurayyah?

Call us, or send clear photos of the spot and its location in Qurayyah on WhatsApp, and we will work out the next step with you.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Nearby areas

Epoxy tank lining near Qurayyah

We also offer epoxy tank lining in Al Wahah (near Qaryah al Ulya), Qurtubah (near Qaryah al Ulya) and Ar Rabwah (near Qaryah al Ulya), among the closest areas to Qurayyah.

Other services in the area

More services in Qurayyah

Worker rolling the white insulation layer onto a roof

Your first step in Qurayyah:
a call or a WhatsApp message

Call us or send photos of the tank interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp