Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Bab As Sab

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Bab As Sab

Epoxy tank lining in Bab As Sab begins with a photo of your tank sent by call or WhatsApp. The area has houses and villas of varying sizes with diverse tanks, some newer and others needing their interior protective coat renewed.

This area has mixed building and tank ages, from recent to older ones where interior coatings may have deteriorated. Roof tanks face harsh sun and heat, while courtyard tanks feel coastal humidity. Epoxy restores protection to interior walls and stops water seeping through pores and fine cracks. Photos reveal the current coating's condition and whether the concrete needs treatment before new lining.

  • Bab As Sab is a residential district in the Eastern Province, close to Al Wasadah, Al Bustan Two and Ash Shamasiyyah, with villas and homes.
  • An older tank whose epoxy has not been renewed may gradually lose water through its porous interior walls even without visible cracks.
What the service includes

The scope of the work in Bab As Sab

  • Treating hairline cracks and crumbling joints before application
  • Closing the coating around pipe entries and the drain opening
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Preparing the surface and leaving it completely dry
How we work

The stages of the work in Bab As Sab

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

We serve Bab As Sab and around itIncluding Al Wasadah, Al Bustan Two and Ash Shamasiyyah, as part of our work across the Eastern Province.

Your request from Bab As Sab comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about epoxy tank lining in Bab As Sab

Can epoxy be applied to a tank that still holds water?

No, the tank must be completely emptied, dried and cleaned before epoxy application. Water and moisture prevent the coating from adhering and affect the protection it provides.

Can new epoxy hide the dark staining from old water discolouration?

Epoxy does not hide stains; the interior walls must first be cleaned of marks and deposits. Thorough cleaning ensures better adhesion and stronger protection, and photos will show us how much cleaning is needed.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

How do I request epoxy tank lining in Bab As Sab?

Call us, or send clear photos of the spot and its location in Bab As Sab on WhatsApp, and we will work out the next step with you.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Wasadah, Al Bustan Two and Ash Shamasiyyah.

Other services in the area

More services in Bab As Sab

Worker rolling the white insulation layer onto a roof

Your first step in Bab As Sab:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp