Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in At Tubayshi

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in At Tubayshi

Epoxy tank lining in At Tubayshi starts with a photo of the tank sent by call or WhatsApp. Villas and houses spread across the district, and their tanks suffer continuous water loss if the concrete is porous or cracked.

At Tubayshi is dominated by small residential buildings and villas, each with a water tank on the roof or in the yard. Concrete in home and villa tanks undergoes daily expansion and contraction from sun heat and cooling, opening small cracks that allow seepage. Epoxy provides a water barrier that does not crack easily and preserves the tank's contents. Photos show the tank's age and any visible damage before coating begins.

  • At Tubayshi is a district in the Eastern Province, close to An Nasriyah, Prince Muhammed Ibn Saud and Al Mazruiyah, with villas and residential homes.
  • Tanks in villas and small homes need strong protection because their concrete undergoes sharp daily temperature swings.
What the service includes

The main items of epoxy tank lining in At Tubayshi

  • Closing the coating around pipe entries and the drain opening
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Rinsing the tank after full cure before it is refilled
  • Treating hairline cracks and crumbling joints before application
How we work

The steps of epoxy tank lining in At Tubayshi

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

Your request from At Tubayshi comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve At Tubayshi and around itIncluding An Nasriyah, Prince Muhammed Ibn Saud and Al Mazruiyah, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on epoxy tank lining in At Tubayshi

Can a villa's tank be coated with epoxy without emptying it completely?

No, the tank must be completely emptied and dried so the epoxy bonds well to the inner surface. A wet tank will not accept coating properly, and photos show the moisture level.

What happens if I don't coat my tank in At Tubayshi and leave the cracks as they are?

Water will continue seeping through cracks and pores, raising your water bills and reducing available supply. Small cracks widen over time due to pressure and heat, and epoxy stops the seepage and protects against further damage.

What should I send you from At Tubayshi?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in At Tubayshi, and we will work out the next step with you.

Does epoxy suit all tank types?

Epoxy suits concrete tanks that can be emptied and dried. It needs a fully dry surface to bond, so it is not used over wet concrete or across moving cracks. Tanks with large cracks or soil movement need the cracks treated first, or a more flexible material chosen. Send photos of the tank and we will advise.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Nearby areas

The same service in nearby areas

We also work near At Tubayshi, in An Nasriyah, Prince Muhammed Ibn Saud and Al Mazruiyah.

Other services in the area

More services in At Tubayshi

Worker rolling the white insulation layer onto a roof

In At Tubayshi and need epoxy tank lining?
Send us photos of the spot

Describe the problem and where it is in At Tubayshi, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp