Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in At Talal (near Hafar Al-Batin)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in At Talal (near Hafar Al-Batin)

We apply epoxy lining to water tanks in At Talal, starting from a photo of the tank and where it sits, sent by call or WhatsApp. Resin is applied to the inner walls and floor to ensure seepage through concrete and joints is stopped.

At Talal in Hafar Al-Batin has family houses and residential buildings of varied age, many with roof tanks that need arrangement to connect to the water network. A raised tank tends to leak at side joints and around pipe openings, and the damage grows with constant exposure to sun. Epoxy suits solid concrete tanks, and the photos make the condition clear.

  • At Talal is a district of Hafar Al-Batin in the Eastern Province, close to An Nahdah, Al Aziziyah and Ar Rabwah.
  • A roof tank endures daytime heat and night cooling, so concrete expands and cracks at the joints.
What the service includes

The epoxy tank lining work in At Talal (near Hafar Al-Batin)

  • Checking the interior walls, the floor, the joints and the pipe entries
  • Preparing the surface and leaving it completely dry
  • Applying primer then epoxy coats across the full interior surface
  • Treating hairline cracks and crumbling joints before application
How we work

From first contact to the finished job in At Talal (near Hafar Al-Batin)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

We serve At Talal (near Hafar Al-Batin) and around itIncluding An Nahdah (near Hafar Al-Batin), Al Aziziyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin), as part of our work across the Eastern Province.

Your request from At Talal (near Hafar Al-Batin) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on epoxy tank lining in At Talal (near Hafar Al-Batin)

Are raised tanks in At Talal coated with epoxy?

Yes, if the tank is concrete and sound enough to prepare. Send photos from the roof, and we will say if the wall needs repair before coating.

What happens to the water during epoxy work?

The tank is emptied and dried before coating, then left until the resin cures. We agree with the household on the emptying period and how water will be supplied meanwhile.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

How do I request epoxy tank lining in At Talal (near Hafar Al-Batin)?

Call us, or send clear photos of the spot and its location in At Talal (near Hafar Al-Batin) on WhatsApp, and we will work out the next step with you.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

Does epoxy suit all tank types?

Epoxy suits concrete tanks that can be emptied and dried. It needs a fully dry surface to bond, so it is not used over wet concrete or across moving cracks. Tanks with large cracks or soil movement need the cracks treated first, or a more flexible material chosen. Send photos of the tank and we will advise.

Nearby areas

Epoxy tank lining near At Talal (near Hafar Al-Batin)

We also offer epoxy tank lining in An Nahdah (near Hafar Al-Batin), Al Aziziyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin), among the closest areas to At Talal (near Hafar Al-Batin).

Other services in the area

More services in At Talal (near Hafar Al-Batin)

Worker rolling the white insulation layer onto a roof

We start with you in At Talal (near Hafar Al-Batin)
with one call

Describe the problem and where it is in At Talal (near Hafar Al-Batin), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp