Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in As Sikak

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in As Sikak

Epoxy tank lining in As Sikak begins with a photo from inside the tank, sent by call or WhatsApp. The walls and floor are coated with resin that seals the pores and treats the cracks through which water escapes.

As Sikak is a small district of scattered homes and closely spaced dwellings, where tanks serve the household directly. Old concrete weakens from within and forms pores that let water through without showing obvious dampness on the surface. Interior photos reveal these pores and cracks, so it can be established whether a resin layer is enough or deeper treatment is needed.

  • As Sikak is a small residential district in the Al-Ahsa governorate of the Eastern Province, lying close to Salwa, Mehdar and Al Batha.
  • Leakage through pores inside the tank often does not show on the outer wall, so the inside must be examined before any judgement is made.
What the service includes

The main items of epoxy tank lining in As Sikak

  • Preparing the surface and leaving it completely dry
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Rinsing the tank after full cure before it is refilled
  • Closing the coating around pipe entries and the drain opening
How we work

How we carry out epoxy tank lining in As Sikak

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

Start from As Sikak with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from As Sikak comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on epoxy tank lining in As Sikak

Can internal leakage be treated when no dampness shows outside?

Often yes, since the loss usually happens from inside. The interior walls are examined through the photos, and the cracks and pores needing treatment are identified.

Do you treat household tanks in As Sikak?

Yes, we serve As Sikak. Send photos from inside and out, and tell us the tank's age and location, so we can agree what is needed before work begins.

Do you offer epoxy tank lining in As Sikak?

Yes. As Sikak is within our service area in the Eastern Province, and we also work in Salwa, Mehdar and Al Batha. Call us or send photos of the spot on WhatsApp.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside As Sikak, the same service is available in Salwa, Mehdar and Al Batha.

Other services in the area

More services in As Sikak

Worker rolling the white insulation layer onto a roof

Epoxy tank lining in As Sikak?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp