Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Ar Rafiah

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Ar Rafiah

Epoxy tank lining in Ar Rafiah starts with photos of the interior walls and floor, sent by call or WhatsApp. The epoxy resin coats the inside of the tank to stop water seeping through porous concrete, cracks and joints.

Ar Rafiah is made up mostly of houses, villas and small residential buildings, and its tanks are often ground-level or tucked into yards. An older concrete tank usually loses water through its pores and the wall and floor joints, where interior epoxy suits the job if the concrete is sound. The photos show whether a full coat is needed or the joints must be repaired first.

  • Ar Rafiah is a town in the Eastern Province, lying close to the old town centre and near Al Zuhur and Al Andalus.
  • Concrete must be dry, clean and sound before epoxy is applied, or the coating will not bond well.
What the service includes

What the service covers in Ar Rafiah

  • Closing the coating around pipe entries and the drain opening
  • Treating hairline cracks and crumbling joints before application
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Applying primer then epoxy coats across the full interior surface
How we work

The steps of epoxy tank lining in Ar Rafiah

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Ar Rafiah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Epoxy tank lining in Ar RafiahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Rafiah

Can an old ground tank in Ar Rafiah be coated with epoxy?

Often yes, if the walls are sound and not crumbling. Cracks and joints are repaired first, then the interior is coated, and the photos will show whether those steps are enough.

What do you need to start work in Ar Rafiah?

Send clear photos of the inside if possible, with a description of the condition and where the tank stands, so we know whether it is on the roof or in the yard before choosing the coating.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

What should I send you from Ar Rafiah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ar Rafiah, and we will work out the next step with you.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Down Town, Al Zuhur (near Ar Rafiah) and Al Andalus (near Ar Rafiah).

Other services in the area

More services in Ar Rafiah

Worker rolling the white insulation layer onto a roof

We start with you in Ar Rafiah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp