Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Ar Rabie (near Hafar Al-Batin)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Ar Rabie (near Hafar Al-Batin)

Epoxy tank lining in Ar Rabie begins with a photo of the tank sent by call or WhatsApp. The epoxy coating covers the interior walls and floor, protecting porous concrete from water loss through cracks and joints.

Ar Rabie has industrial and residential buildings with tanks ranging from old to new. An older concrete tank may have multiple cracks at corners and joints, and epoxy creates a continuous sealed layer on walls and floor. A newer tank might show minor seepage around pipe entry or the base, and epoxy prevents it from worsening. Photos show the extent of damage and whether deep cracks need repair before coating.

  • Ar Rabie is a district in the Eastern Province, close to the Industrial area, Ar Rawdah and Fulaij, with industrial and residential buildings.
  • A water tank in industrial and residential buildings faces constant pressure from the water's weight and temperature fluctuations, so epoxy must tolerate both pressure and expansion.
What the service includes

What the service covers in Ar Rabie (near Hafar Al-Batin)

  • Closing the coating around pipe entries and the drain opening
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Rinsing the tank after full cure before it is refilled
  • Applying primer then epoxy coats across the full interior surface
How we work

The stages of the work in Ar Rabie (near Hafar Al-Batin)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

Your request from Ar Rabie (near Hafar Al-Batin) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Ar Rabie (near Hafar Al-Batin) and around itIncluding Industrial (near Hafar Al-Batin), Ar Rawdah (near Hafar Al-Batin) and Fulaij, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Rabie (near Hafar Al-Batin)

Will epoxy repair an old cracked tank in Ar Rabie?

Epoxy stops seepage through fine cracks and joints, but very deep cracks need repair first. Send photos of the cracks and we will assess whether they need treatment before coating.

How long does epoxy tank lining last in Ar Rabie?

Durability depends on the concrete's condition and tank maintenance. Epoxy protects the surface from water and seepage as long as the coating stays intact; photos show the surface condition before starting.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Is Ar Rabie (near Hafar Al-Batin) within your service area?

Yes, Ar Rabie (near Hafar Al-Batin) is one of the areas we work in, as are Industrial (near Hafar Al-Batin), Ar Rawdah (near Hafar Al-Batin) and Fulaij. To start, call us or message us on WhatsApp.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Nearby areas

The same service in nearby areas

If the site is outside Ar Rabie (near Hafar Al-Batin), the same service is available in Industrial (near Hafar Al-Batin), Ar Rawdah (near Hafar Al-Batin) and Fulaij.

Other services in the area

More services in Ar Rabie (near Hafar Al-Batin)

Worker rolling the white insulation layer onto a roof

Your first step in Ar Rabie (near Hafar Al-Batin):
a call or a WhatsApp message

Call us or send photos of the tank interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp