Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Yasmin (near Al Khunn)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Yasmin (near Al Khunn)

Epoxy tank lining in Al Yasmin covers the inside of a water tank with resin to reduce seepage through porous concrete, cracks and joints. Send photos of the tank, its cover and the pipe entries by call or on WhatsApp, and we will explain what the surfaces need before any work starts.

Al Yasmin is largely a newer residential district of villas and compound houses on mid-sized plots, and the water tank usually stands in the yard or beside the service area. Newer tanks may be sound inside, yet the joints around fittings and pipe entries can still seep, and the epoxy film targets those inside faces. The approach is set by the tank itself rather than by the neighbourhood, so the photos show whether the coat alone would help or extra preparation is needed.

  • Al Yasmin is a district in the Eastern Province, lying close to Yabrin, Al Muruj and Al Ekhaa.
  • Joints around fittings and pipe entries are where a tank often seeps, so they are checked before any resin goes on.
What the service includes

What the service covers in Al Yasmin (near Al Khunn)

  • Applying primer then epoxy coats across the full interior surface
  • Closing the coating around pipe entries and the drain opening
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Preparing the surface and leaving it completely dry
How we work

The steps of epoxy tank lining in Al Yasmin (near Al Khunn)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

Start from Al Yasmin (near Al Khunn) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Yasmin (near Al Khunn) and around itIncluding Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Yasmin (near Al Khunn)

Will a newer tank in Al Yasmin still need lining?

It may not, if the interior is sound and the joints hold. A check of the photos and the joints shows whether a resin film would help, and we will say so plainly if it would not.

Do you line tanks in yards at compound houses?

Yes, we serve Al Yasmin. Tell us where the tank stands in the yard, how the cover opens and whether it is easy to reach, so we can plan access with you before any work.

Does epoxy suit all tank types?

Epoxy suits concrete tanks that can be emptied and dried. It needs a fully dry surface to bond, so it is not used over wet concrete or across moving cracks. Tanks with large cracks or soil movement need the cracks treated first, or a more flexible material chosen. Send photos of the tank and we will advise.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Is Al Yasmin (near Al Khunn) within your service area?

Yes, Al Yasmin (near Al Khunn) is one of the areas we work in, as are Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa. To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

We also offer epoxy tank lining in Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa, among the closest areas to Al Yasmin (near Al Khunn).

Other services in the area

More services in Al Yasmin (near Al Khunn)

Worker rolling the white insulation layer onto a roof

Tell us about your site in Al Yasmin (near Al Khunn)
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp