Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Wadi

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Wadi

Epoxy tank lining in Al Wadi begins when you send a photo of the tank by call or WhatsApp. The district has diverse villas and houses, each relying on a tank for water storage that needs protection from leaks and damage.

Tanks in Al Wadi face challenges from fierce summer heat and humidity that can increase concrete oxidation. Fine cracks start small but widen over time, especially at corners and joints where stress concentrates. Epoxy spreads over the entire inner surface and seals these cracks tightly, stopping slow leaks and gradual damage. Inspecting the photos helps determine the degree of damage and the right steps forward.

  • Al Wadi is a district in the Eastern Province, situated near Al Nakhil, Ar Rayan and An Nayfiyah, with houses and villas on diverse residential plots.
  • A tank exposed to intense heat loses water faster if its inner walls contain fine cracks.
What the service includes

What we do for you in Al Wadi

  • Checking the interior walls, the floor, the joints and the pipe entries
  • Applying primer then epoxy coats across the full interior surface
  • Closing the coating around pipe entries and the drain opening
  • Rinsing the tank after full cure before it is refilled
How we work

The steps of epoxy tank lining in Al Wadi

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

We serve Al Wadi and around itIncluding Al Nakhil (near Hafar Al-Batin), Ar Rayan (near Hafar Al-Batin) and An Nayfiyah (near Hafar Al-Batin), as part of our work across the Eastern Province.

Start from Al Wadi with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Wadi

Can an old tank in Al Wadi be lined with epoxy?

Usually yes, if the concrete retains its strength. Photos show whether there are major cracks or deep erosion preventing coating. We judge this from the photos you send us.

How does an epoxy layer protect the tank from air moisture in Al Wadi?

Epoxy seals the concrete from inside, preventing water from seeping out of the tank, but does not stop external moisture entering the wall. Full protection depends on the tank's location and outer concrete quality as well.

Do you offer epoxy tank lining in Al Wadi?

Yes. Al Wadi is within our service area in the Eastern Province, and we also work in Al Nakhil (near Hafar Al-Batin), Ar Rayan (near Hafar Al-Batin) and An Nayfiyah (near Hafar Al-Batin). Call us or send photos of the spot on WhatsApp.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Wadi, the same service is available in Al Nakhil (near Hafar Al-Batin), Ar Rayan (near Hafar Al-Batin) and An Nayfiyah (near Hafar Al-Batin).

Other services in the area

More services in Al Wadi

Worker rolling the white insulation layer onto a roof

Epoxy tank lining in Al Wadi?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp