Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Majidiyah

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Majidiyah

Epoxy tank lining in Al Majidiyah starts with your call or WhatsApp message, with photos of the tank inside and out. The district holds warehouses, workshops and commercial buildings whose tanks face steady pressure and may need periodic treatment. Epoxy protects tank walls from water loss through pores and cracks.

In Al Majidiyah, most tanks serve warehouses and workshops that consume large amounts of water. Concrete tanks in these facilities face gradual internal wear because water stays in them longer and reacts with the concrete. Epoxy forms a protective layer across the entire inner surface, stopping slow leaks and extending the tank's life. Assessment relies on clear photos of the current state before deciding layer thickness and treatment.

  • Al Majidiyah is a district in the Eastern Province near the Warehouse Area, Al Aqiq and Al Khamisah, with commercial facilities and workshops.
  • Tanks in commercial facilities run year-round under heavy load, so they must tolerate strain and wear.
What the service includes

What the service covers in Al Majidiyah

  • Preparing the surface and leaving it completely dry
  • Treating hairline cracks and crumbling joints before application
  • Applying primer then epoxy coats across the full interior surface
  • Closing the coating around pipe entries and the drain opening
How we work

The stages of the work in Al Majidiyah

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Your request from Al Majidiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Majidiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book epoxy tank lining in Al Majidiyah

Is epoxy suitable for a tank in a workshop using water heavily?

Yes, epoxy is designed for tanks under heavy use. It protects against internal wear and leaks, and needs periodic inspection to stay sound; photos of the tank's initial state guide us both.

How often does an epoxy-lined tank in Al Majidiyah need retreating?

That depends on how hard the tank is used, the water quality and the load. Regular inspections show whether the layer stays sound or needs renewal, and photos help you spot any change yourself too.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Do you offer epoxy tank lining in Al Majidiyah?

Yes. Al Majidiyah is within our service area in the Eastern Province, and we also work in Warehouse Area, Al Aqiq (near Inak) and Al Khamisah. Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Warehouse Area, Al Aqiq (near Inak) and Al Khamisah.

Other services in the area

More services in Al Majidiyah

Worker rolling the white insulation layer onto a roof

Tell us about your site in Al Majidiyah
and we will plan the next step with you

Describe the problem and where it is in Al Majidiyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp