Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Jamiyin (near Dammam)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Jamiyin (near Dammam)

Epoxy tank lining in Al Jamiyin begins with a photo of the tank's interior, sent by call or WhatsApp. The district has houses, villas and relatively modern residential buildings, where the tank is often on the roof of the newer ones.

Al Jamiyin is largely made of villas and houses that are newer than in older districts, so its tanks tend to be younger and more regularly built. Even so, some concrete tanks show porosity, especially at the joints and around pipe entries. Epoxy can seal that porosity where the structure is sound. The photos will show whether your tank needs cracks treated first.

  • Al Jamiyin is a residential district of Dammam in the Eastern Province, lying near An Nuzhah, Ar Rayyan and Al Wahah.
  • A newer tank often needs its joints and inlets checked before lining, as seepage usually appears there.
What the service includes

The scope of the work in Al Jamiyin (near Dammam)

  • Rinsing the tank after full cure before it is refilled
  • Preparing the surface and leaving it completely dry
  • Applying primer then epoxy coats across the full interior surface
  • Checking the interior walls, the floor, the joints and the pipe entries
How we work

The stages of the work in Al Jamiyin (near Dammam)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

Start from Al Jamiyin (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Jamiyin (near Dammam) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jamiyin (near Dammam)

Is epoxy enough for a newly built tank in Al Jamiyin?

It may be enough if porosity is limited and the joints are sound. If leakage shows at the joints, that spot is treated first, and the photos will make this clear before a method is chosen.

How do I send photos of a villa tank in Al Jamiyin?

Send through WhatsApp a photo of the tank interior and its surroundings, along with a view of the general location, and we will come back after reviewing the photos to explain what is needed.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Does epoxy suit all tank types?

Epoxy suits concrete tanks that can be emptied and dried. It needs a fully dry surface to bond, so it is not used over wet concrete or across moving cracks. Tanks with large cracks or soil movement need the cracks treated first, or a more flexible material chosen. Send photos of the tank and we will advise.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Is Al Jamiyin (near Dammam) within your service area?

Yes, Al Jamiyin (near Dammam) is one of the areas we work in, as are An Nuzhah (near Dammam), Ar Rayyan (near Dammam) and Al Wahah (near Dammam). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: An Nuzhah (near Dammam), Ar Rayyan (near Dammam) and Al Wahah (near Dammam).

Other services in the area

More services in Al Jamiyin (near Dammam)

Worker rolling the white insulation layer onto a roof

We start with you in Al Jamiyin (near Dammam)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp