Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Hussam

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Hussam

Epoxy tank lining in Al Hussam begins with a photo sent by call or WhatsApp. The district has apartment blocks and villas with tanks on roofs or in tight spaces. Epoxy forms an internal water barrier protecting concrete from wear and leaks.

Al Hussam is a residential district mixing older and newer blocks with small villas, where water tanks vary in design and condition. A villa tank may sit in an open yard exposed to heat and humidity swings, while a block tank may be wedged in a corner that is hard to reach. Hidden leaks through fine cracks or slow joints need a thick epoxy coat covering every interior surface. Photos help us understand the space and conditions before starting.

  • Al Hussam is a residential district in the Eastern Province, close to As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah, with mixed apartment blocks and villas.
  • In older districts, roof tanks face repeated heat stress, which can widen existing cracks.
What the service includes

The scope of the work in Al Hussam

  • Closing the coating around pipe entries and the drain opening
  • Rinsing the tank after full cure before it is refilled
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Preparing the surface and leaving it completely dry
How we work

This is how we work in Al Hussam

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

We serve Al Hussam and around itIncluding As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah, as part of our work across the Eastern Province.

Start from Al Hussam with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Hussam

Can epoxy be applied in a tight space around an Al Hussam tank?

Yes, but access affects the method and time needed. Tell us exactly where the tank is and what space is available so we can judge feasibility.

Does epoxy protect the tank from external damp and moisture?

Epoxy protects against water leaking inward and concrete decay from inside; it is applied to the interior. External damp may need separate exterior waterproofing if needed.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Does epoxy suit all tank types?

Epoxy suits concrete tanks that can be emptied and dried. It needs a fully dry surface to bond, so it is not used over wet concrete or across moving cracks. Tanks with large cracks or soil movement need the cracks treated first, or a more flexible material chosen. Send photos of the tank and we will advise.

Is Al Hussam within your service area?

Yes, Al Hussam is one of the areas we work in, as are As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah. To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

We also offer epoxy tank lining in As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah, among the closest areas to Al Hussam.

Other services in the area

More services in Al Hussam

Worker rolling the white insulation layer onto a roof

Your first step in Al Hussam:
a call or a WhatsApp message

Call us or send photos of the tank interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp