Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Amanah

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Amanah

Epoxy tank lining in Al Amanah begins with WhatsApp photos of the tank and its conditions. The district has residential buildings of varying heights with tanks on different roofs, and epoxy stops leaks through fine pores and cracks in concrete.

Al Amanah has multi-storey apartment blocks and villas, each with a tank on its roof. Tanks here range from old to new; older ones show cracks around joints and pipes, middle-aged ones slow leaks. Epoxy treats these cases by building a seal layer on walls and floor. If a tank is walled in, access may be tight, so photos show its location and approach. Heat on high roofs may affect application, so we may choose set times.

  • Al Amanah is a district in the Eastern Province, close to Ash Shrouk, Al Matar and Al Fursan, with multi-storey residential buildings.
  • A high-rise apartment block's tank bears greater pressure than a villa or detached house, so cracks appear more readily.
What the service includes

The main items of epoxy tank lining in Al Amanah

  • Preparing the surface and leaving it completely dry
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Rinsing the tank after full cure before it is refilled
  • Closing the coating around pipe entries and the drain opening
How we work

How we carry out epoxy tank lining in Al Amanah

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Start from Al Amanah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Amanah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on epoxy tank lining in Al Amanah

Can we waterproof a tank in an apartment building without disturbing residents?

Yes, application is on the roof and does not disturb homes inside. Water needs only be off during application and drying, usually at set hours that can be arranged with you.

What if the tank is in a tight spot between building walls?

Tight access may slow the work but does not prevent it. Send photos showing the space around the tank and surrounding walls so we can assess whether we can reach and apply epoxy properly.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Is Al Amanah within your service area?

Yes, Al Amanah is one of the areas we work in, as are Ash Shrouk (near An Nabiyah), Al Matar (near An Nabiyah) and Al Fursan. To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

We also work near Al Amanah, in Ash Shrouk (near An Nabiyah), Al Matar (near An Nabiyah) and Al Fursan.

Other services in the area

More services in Al Amanah

Worker rolling the white insulation layer onto a roof

In Al Amanah and need epoxy tank lining?
Send us photos of the spot

Call us or send photos of the tank interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp