Abraj Al AzlContracting
Call العربية
Brush applying grey cementitious slurry to the wall of an empty tank

Cementitious tank waterproofing in Badr

It bonds to damp concrete

A mineral waterproof coating applied inside a tank to its walls, floor and joints to stop leaks

+966 54 311 2066
The service in your area

Cementitious tank waterproofing in Badr

Cementitious tank waterproofing in Badr starts with WhatsApp photos of the tank inside and outside. Badr is a residential district with villas and various apartment blocks where tanks need protection from leaks and damp. Cementitious coating provides strong waterproofing to prevent water ingress.

Badr has villas and apartment blocks of varying ages and designs. Badr's tanks may leak at corners, floors or around intake and outlet pipes. Older tanks may show slight wear or long cracks. Cementitious coating fills all gaps and pores, creating a tight protective layer. Before application, the surface must be clean of algae, salts and deposits. Photos help determine what cleaning and preparation is needed.

  • Badr is a district in the Eastern Province, near Ohod and An Noor, with villas and residential apartment blocks.
  • Tanks in residential districts may accumulate salts and algae from water and air, which affects how well coating adheres.
What the service includes

What the service covers in Badr

  • Applying the cementitious coating to the walls, the floor and all corners
  • Checking the inside walls, the floor, the joints and the pipe entries
  • Emptying the tank, cleaning the surface and removing any crumbling old layer
  • Letting the layer cure with the right moisture before the tank is refilled
How we work

From first contact to the finished job in Badr

1

Send photos of the tank

On WhatsApp: photos of the inside and outside walls, the tank base, the pipe entries and the joints, so we can read its condition and decide the right treatment.

2

Empty and prepare the surface

The tank is emptied and cleaned, the old or crumbling layer is cut back, then cracks, joints and pipe entries are treated with compatible materials before the coating goes on.

3

Apply the cementitious coating

The coating is brushed or trowelled onto the walls and floor in layers, with care at corners, joint edges and pipe entries, depending on the surface condition and the depth of the porosity.

4

Cure with moisture

The coating is left to cure, and a little ambient moisture is kept around it, because the chemical reaction that bonds it to the concrete needs moisture rather than complete dryness.

What sets us apart

Why Abraj Al Azl?

It bonds on a damp surfaceUnlike coatings that need a fully dry base, the cementitious layer works with the moisture already in the concrete and bonds through it.

We serve Badr and around itIncluding Ohod, An Noor (near Ohod) and Al Manar (near Dammam), as part of our work across the Eastern Province.

Cementitious tank waterproofing in BadrWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on cementitious tank waterproofing in Badr

Must a tank be cleaned before cementitious coating in Badr?

Yes, cleaning is essential. Algae, salts and deposits are removed to prepare the surface. Photos show how much cleaning is needed before waterproofing starts.

How long does cementitious coating take to apply on a tank in Badr?

Time depends on the tank's size, condition and how many coats are needed. After application, the coating needs a drying period before the tank is refilled with water.

How long should I wait before refilling the tank after waterproofing?

The coating needs enough time to set and complete its chemical reaction with the concrete before water touches it. How long depends on the thickness of the layers, the surrounding moisture and the temperature. We tell you when the tank is ready based on the conditions at the site once the work is done.

How do I request cementitious tank waterproofing in Badr?

Call us, or send clear photos of the spot and its location in Badr on WhatsApp, and we will work out the next step with you.

Can the coating be applied without fully emptying the tank?

No. The tank must be emptied, cleaned and its surface prepared before anything is applied. A little moisture inside the concrete structure does not stop the coating bonding, but water standing on the surface will. Emptying the tank is a basic condition for the layer to work.

How are cracks treated before the cementitious coating goes on?

Hairline cracks are covered as the coating is brushed in and pressed into the crack. Wider cracks are opened out first, then filled with a compatible cementitious material or a flexible sealant depending on whether the crack moves, and the coating goes over them once they have set.

Nearby areas

Areas near Badr

If the site is outside Badr, the same service is available in Ohod, An Noor (near Ohod) and Al Manar (near Dammam).

Other services in the area

More services in Badr

Mosaic-tiled seaside pool

Cementitious tank waterproofing in Badr?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp