Abraj Al AzlContracting
Call العربية
Brush applying grey cementitious slurry to the wall of an empty tank

Cementitious tank waterproofing in Al Yamamah

It bonds to damp concrete

A mineral waterproof coating applied inside a tank to its walls, floor and joints to stop leaks

+966 54 311 2066
The service in your area

Cementitious tank waterproofing in Al Yamamah

Cementitious tank waterproofing in Al Yamamah starts with photos of the tank and its condition sent by call or WhatsApp. The service applies a mineral coating to the tank's inner walls, floor and joints to stop leaks.

Al Yamamah comprises villas and medium-sized residential blocks, most with tanks on the roof or in the rear courtyard. The concrete tanks typically show damp marks around joints and corners from constant exposure to intense sun and heat. The cementitious coating penetrates the pores to form a barrier against water and moisture, and the photos show whether the tank needs cleaning or crack repair before application.

  • Al Yamamah is a district in the Eastern Province, close to Ad Dirah, Az Zomorod and Al Nakhil, comprising houses and residential buildings.
  • Concrete tanks in extremely hot areas need strong protection against both heat and water damage.
What the service includes

What we do for you in Al Yamamah

  • Closing the waterproofing around pipe entries and the tank base
  • Letting the layer cure with the right moisture before the tank is refilled
  • Emptying the tank, cleaning the surface and removing any crumbling old layer
  • Checking the inside walls, the floor, the joints and the pipe entries
How we work

From first contact to the finished job in Al Yamamah

1

Send photos of the tank

On WhatsApp: photos of the inside and outside walls, the tank base, the pipe entries and the joints, so we can read its condition and decide the right treatment.

2

Empty and prepare the surface

The tank is emptied and cleaned, the old or crumbling layer is cut back, then cracks, joints and pipe entries are treated with compatible materials before the coating goes on.

3

Apply the cementitious coating

The coating is brushed or trowelled onto the walls and floor in layers, with care at corners, joint edges and pipe entries, depending on the surface condition and the depth of the porosity.

4

Cure with moisture

The coating is left to cure, and a little ambient moisture is kept around it, because the chemical reaction that bonds it to the concrete needs moisture rather than complete dryness.

What sets us apart

Why Abraj Al Azl?

It bonds on a damp surfaceUnlike coatings that need a fully dry base, the cementitious layer works with the moisture already in the concrete and bonds through it.

Start from Al Yamamah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Yamamah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cementitious tank waterproofing in Al Yamamah

Must the tank be emptied before applying cementitious waterproofing?

Yes, the tank must be completely empty and dry. We will advise you on preparation steps after reviewing the photos, and additional cleaning may be needed if there are deposits or sediment.

How long does cementitious waterproofing take on a tank in Al Yamamah?

The time depends on the tank's size and condition. You will know the details after sending photos and agreeing on the work plan.

How are cracks treated before the cementitious coating goes on?

Hairline cracks are covered as the coating is brushed in and pressed into the crack. Wider cracks are opened out first, then filled with a compatible cementitious material or a flexible sealant depending on whether the crack moves, and the coating goes over them once they have set.

How long should I wait before refilling the tank after waterproofing?

The coating needs enough time to set and complete its chemical reaction with the concrete before water touches it. How long depends on the thickness of the layers, the surrounding moisture and the temperature. We tell you when the tank is ready based on the conditions at the site once the work is done.

Is Al Yamamah within your service area?

Yes, Al Yamamah is one of the areas we work in, as are Ad Dirah, Az Zomorod and Al Nakhil (near Tarout). To start, call us or message us on WhatsApp.

What decides the cost of cementitious tank waterproofing?

The size of the tank, the number of cracks, how much of the old layer has broken down, how easily the site can be reached, and whether the work covers only the inside or the outside as well. Send photos of the inside and outside walls with rough dimensions on WhatsApp and we will advise on the right treatment.

Nearby areas

We also offer it in neighbouring areas

We also offer cementitious tank waterproofing in Ad Dirah, Az Zomorod and Al Nakhil (near Tarout), among the closest areas to Al Yamamah.

Other services in the area

More services in Al Yamamah

Mosaic-tiled seaside pool

Cementitious tank waterproofing in Al Yamamah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp