Abraj Al AzlContracting
Call العربية
Brush applying grey cementitious slurry to the wall of an empty tank

Cementitious tank waterproofing in Al Matar District

It bonds to damp concrete

A mineral waterproof coating applied inside a tank to its walls, floor and joints to stop leaks

+966 54 311 2066
The service in your area

Cementitious tank waterproofing in Al Matar District

We waterproof tanks with a cementitious coating in Al Matar District in Al Ahsa, beginning with photos of the tank and its site sent by call or WhatsApp. The district has mixed residential buildings close to the university, and treatment varies with the tank's age and surface condition.

The district has apartment blocks and scattered houses, with many occupants being students and workers, and most tanks stand on roofs. Tanks range from older concrete ones showing minor joint cracks to newer ones that only need the coating renewed. Roof tanks can need protection from day-to-night temperature swings. Photos show whether a tank needs repair or simply renewal.

  • Al Matar District is a residential district in Al Ahsa in the Eastern Province, close to Imam Muhammed Ibn Saud Islamic University and Al Quds District.
  • Roof tanks endure daily temperature swings, so the flexibility of the coating matters in choosing it.
What the service includes

The cementitious tank waterproofing work in Al Matar District

  • Applying the cementitious coating to the walls, the floor and all corners
  • Closing the waterproofing around pipe entries and the tank base
  • Checking the inside walls, the floor, the joints and the pipe entries
  • Treating cracks and joints before the coating is applied
How we work

From first contact to the finished job in Al Matar District

1

Send photos of the tank

On WhatsApp: photos of the inside and outside walls, the tank base, the pipe entries and the joints, so we can read its condition and decide the right treatment.

2

Empty and prepare the surface

The tank is emptied and cleaned, the old or crumbling layer is cut back, then cracks, joints and pipe entries are treated with compatible materials before the coating goes on.

3

Apply the cementitious coating

The coating is brushed or trowelled onto the walls and floor in layers, with care at corners, joint edges and pipe entries, depending on the surface condition and the depth of the porosity.

4

Cure with moisture

The coating is left to cure, and a little ambient moisture is kept around it, because the chemical reaction that bonds it to the concrete needs moisture rather than complete dryness.

What sets us apart

Why Abraj Al Azl?

It seals the pores, not just covers themThe mineral material works into the concrete structure and fills the pores, making the concrete itself denser and less permeable.

Start from Al Matar District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Matar District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious tank waterproofing in Al Matar District

Do you waterproof apartment tanks in Al Matar District?

Yes, we serve Al Matar District. Send photos of the tank and its location, and tell us whether it is on a shared roof or private to the flat so we can plan access with you.

Is a cementitious coating enough for a tank on an exposed roof?

The answer depends on the concrete condition and crack size, which only photos reveal. If the concrete is sound, a cementitious coating is usually a suitable choice.

How are cracks treated before the cementitious coating goes on?

Hairline cracks are covered as the coating is brushed in and pressed into the crack. Wider cracks are opened out first, then filled with a compatible cementitious material or a flexible sealant depending on whether the crack moves, and the coating goes over them once they have set.

What decides the cost of cementitious tank waterproofing?

The size of the tank, the number of cracks, how much of the old layer has broken down, how easily the site can be reached, and whether the work covers only the inside or the outside as well. Send photos of the inside and outside walls with rough dimensions on WhatsApp and we will advise on the right treatment.

How do I request cementitious tank waterproofing in Al Matar District?

Call us, or send clear photos of the spot and its location in Al Matar District on WhatsApp, and we will work out the next step with you.

How long should I wait before refilling the tank after waterproofing?

The coating needs enough time to set and complete its chemical reaction with the concrete before water touches it. How long depends on the thickness of the layers, the surrounding moisture and the temperature. We tell you when the tank is ready based on the conditions at the site once the work is done.

Nearby areas

Areas near Al Matar District

We also work near Al Matar District, in Imam Muhammed Ibn Saud Islamic University District, Al Quds District and As Suqur District.

Other services in the area

More services in Al Matar District

Mosaic-tiled seaside pool

Your first step in Al Matar District:
a call or a WhatsApp message

Describe the problem and where it is in Al Matar District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp